Sterling SVL-D, SVL-A, SVL-B, SVL-C Quick Start Guide -SVL Self Contained Material Loader

Page 47

6-3 Quick Start Guide –SVL Self Contained Material Loader

Unpack all parts. Check for the following:

Material receiver with level sensor and mounting option

Control Assembly(s) Venturi assembly(s) Vinyl flexible hose(s)

Compressed air hose(s) Operating instructions (on CD)

Mount the material receiver using the flange provided on its base.

Mount the control assembly at a location that is readily accessible. Make sure that the compressed air hose and level sensor cable are long enough to reach the control assembly.

Connect the compressed air supply from the control assembly to the fitting located on the material pick up wand using the poly tubing supplied with the equipment.

Connect shop compressed air to the regulator on the control assembly. The compressed air connection must be 70-90 psi (5-6 bar). (Minimum 8 SCFM, maximum 25.9 SCFM)

Plug the control assembly into the main power socket. Make sure that the correct voltage is being used.

Adjust the level sensor to sense the material that is being conveyed into the conveying hopper.

Maintain the unit as stated in Chapter 5 of this manual. Convey material

SVL-A, SVL-B, SVL-C, & SVL-D Self-Contained Material Loaders - Venturi Style 47 of 49

Image 47
Contents SVL-A, SVL-B, SVL-C, & SVL-D Operation and Installation InstructionsPage Unpacking and Inspection Shipping InformationTable of Contents Technical Data How to Use This Manual Safety InstructionsExplanations and Information How to Use This Manual For Your SafetyMaintenance Responsibility Unit SafetyGeneral Information InstallationOror Not to scale Installing the Material ReceiverPage SF-1 Feeder To Digital Dosing FeederShop Air Installing the Control AssemblyAssembly 10 Venturi Assembly Connecting the Compressed Air SupplyPerformance Connecting Material LinesTo Install the Ratio Option SVL-C Two inlet InstallationElectrical Connection Operational Summary Functional DescriptionMethod of Functioning Venturi AssemblyControl and Regulator Unit Control AssemblyPreparations SetupAdjusting Compressed Air Flow Setting the Mixing Ratio of the Components SVL-C Units Operation Basic Setting of the Filling Level in the Conveyor HopperMounting Electrical ConnectionProgramming Empty adjustmentLocking Full adjustmentUnlocking Error messagesSet-up / Operation Daily Weekly Every 3 months MaintenanceMaintenance Intervals Pertaining to the use of compressed air Cleaning the Conveying FilterSVL-A Cleaning the Compressed Air FilterDisassembly Adjusting the Level ProbeRemedy See Test Steps Below TroubleshootingPage Technical Data SVL-A Dimension SheetSVL-B SVL-C SVL-D Spare Parts Lists SVL-B SVL-C Control Assembly Wand Assembly 10 Take-Off Wand Assembly Quick Start Guide -SVL Self Contained Material Loader Parts Department Technical Assistance