Sterling SVL-A, SVL-B, SVL-C, SVL-D Cleaning the Compressed Air Filter, Svl-A

Page 32

4.Install/reinstall the filter. Firmly press down on the filter to make sure a good seal is provided around the entire perimeter of the filter module. The filter should fit evenly on the top of the loader body.

Figure 5.1: SVL-A

Figure 5.2: SVL-B

5-3 Cleaning the Compressed Air Filter

The compressed air supply to the loader is provided with a moisture trap to prevent troublesome moisture, contained in the air, from touching your material. The filter bowl should be drained regularly to remove this moisture.

To remove moisture:

1.Open the filter bowl drain. Turn the knob on the bottom of the filter bowl counterclockwise. Leave the drain open until all moisture has been removed.

2.Close the filter bowl drain. Turn the knob clockwise to close the drain.

WARNING!

Switch the unit OFF. Disconnect the main electrical plug.

SVL-A, SVL-B, SVL-C, & SVL-D Self-Contained Material Loaders - Venturi Style 32 of 49

Image 32
Contents Operation and Installation Instructions SVL-A, SVL-B, SVL-C, & SVL-DPage Shipping Information Unpacking and InspectionTable of Contents Technical Data Safety Instructions How to Use This ManualExplanations and Information For Your Safety How to Use This ManualUnit Safety Maintenance ResponsibilityInstallation General InformationOror Installing the Material Receiver Not to scalePage To Digital Dosing Feeder SF-1 FeederShop Air Installing the Control AssemblyAssembly Connecting the Compressed Air Supply 10 Venturi AssemblyConnecting Material Lines PerformanceSVL-C Two inlet Installation To Install the Ratio OptionElectrical Connection Functional Description Operational SummaryVenturi Assembly Method of FunctioningControl Assembly Control and Regulator UnitPreparations SetupAdjusting Compressed Air Flow Setting the Mixing Ratio of the Components SVL-C Units Basic Setting of the Filling Level in the Conveyor Hopper MountingElectrical Connection OperationEmpty adjustment ProgrammingFull adjustment LockingError messages Unlocking Set-up / Operation Daily Weekly Every 3 months MaintenanceMaintenance Intervals Cleaning the Conveying Filter Pertaining to the use of compressed airCleaning the Compressed Air Filter SVL-AAdjusting the Level Probe DisassemblyTroubleshooting Remedy See Test Steps BelowPage Technical Data Dimension Sheet SVL-ASVL-B SVL-C SVL-D Spare Parts Lists SVL-B SVL-C Control Assembly Wand Assembly 10 Take-Off Wand Assembly Quick Start Guide -SVL Self Contained Material Loader Technical Assistance Parts Department