Sterling SVL-D, SVL-A, SVL-B, SVL-C installation instructions Full adjustment, Locking

Page 27

Full adjustment

After empty adjustment the full state is to be achieved, if possible, so that the unit switches.

The full adjustment can be repeated as often as you like. The stored value for the empty state is not overwritten by the full adjustment. After a new empty adjustment both values are automatically set again, the values last defined are overwritten. Therefore always carry out the empty adjustment first, then, if necessary, the full adjustment!

Locking

The stored adjustment values can be protected against unauthorized programming as follows (factory setting: not locked):

When the programming pushbutton is released the unit is locked and all programming functions are inactive. The unit returns to the operating mode.

If this operation starts from the locked state, the green LED does not react for 10s. After 10s the unit is unlocked (see "Unlocking").

SVL-A, SVL-B, SVL-C, & SVL-D Self-Contained Material Loaders - Venturi Style 27 of 49

Image 27
Contents SVL-A, SVL-B, SVL-C, & SVL-D Operation and Installation InstructionsPage Unpacking and Inspection Shipping InformationTable of Contents Technical Data How to Use This Manual Safety InstructionsExplanations and Information How to Use This Manual For Your SafetyMaintenance Responsibility Unit SafetyGeneral Information InstallationOror Not to scale Installing the Material ReceiverPage SF-1 Feeder To Digital Dosing FeederInstalling the Control Assembly AssemblyShop Air 10 Venturi Assembly Connecting the Compressed Air SupplyPerformance Connecting Material LinesTo Install the Ratio Option SVL-C Two inlet InstallationElectrical Connection Operational Summary Functional DescriptionMethod of Functioning Venturi AssemblyControl and Regulator Unit Control AssemblySetup Adjusting Compressed Air FlowPreparations Setting the Mixing Ratio of the Components SVL-C Units Operation Basic Setting of the Filling Level in the Conveyor HopperMounting Electrical ConnectionProgramming Empty adjustmentLocking Full adjustmentUnlocking Error messagesSet-up / Operation Maintenance Maintenance IntervalsDaily Weekly Every 3 months Pertaining to the use of compressed air Cleaning the Conveying FilterSVL-A Cleaning the Compressed Air FilterDisassembly Adjusting the Level ProbeRemedy See Test Steps Below TroubleshootingPage Technical Data SVL-A Dimension SheetSVL-B SVL-C SVL-D Spare Parts Lists SVL-B SVL-C Control Assembly Wand Assembly 10 Take-Off Wand Assembly Quick Start Guide -SVL Self Contained Material Loader Parts Department Technical Assistance