CHAPTER 3 INSTALLATION
3.1 GENERAL
This Chapter contains instructions for initial inspection, preparation for use and repackaging for shipment. Connection to PC, setting the communication port and linking GenesysTM power sup- plies are described in Chapter 7.
NOTE
GenesysTM power supplies generate magnetic fields, which might affect the operation of other instruments. If your equipment is susceptible to magnetic fields, do not position it adjacent to the power supply.
3.2 PREPARATION FOR USE
In order to be operational, the power supply must be connected to an appropriate AC source. The AC source voltage should be within the power supply specification. Do not apply power be- fore reading Section 3.6 and 3.7.
Table
Step no. | Item | Description | Reference |
|
|
|
|
1 | Inspection | Initial physical inspection of the power supply | Section 3.3 |
|
|
|
|
2 | Installation | Installing the power supply, | Section 3.4 |
|
| Ensuring adequate ventilation. | Section 3.5 |
|
|
|
|
3 | AC source | AC source requirements | Section 3.6 |
|
| Connecting the power supply to the AC source | Section 3.7 |
|
|
|
|
4 | Test | Section 3.8 | |
|
|
|
|
5 | Load connection | Wire size selection. Local/Remote sensing. | Section 3.9 |
|
| Single or multiple loads. |
|
|
|
|
|
6 | Default setting | The power supply setting at shipment. | Section 7.2.1 |
|
|
|
|
Table
3.3 INITIAL INSPECTIONS
Prior to shipment this power supply was inspected and found free of mechanical or electrical de- fects. Upon unpacking of the power supply, inspect for any damage, which may have occurred in transit.
The inspection should confirm that there is no exterior damage to the power supply such as bro- ken knobs or connectors and that the front panel and meters face are not scratched or cracked. Keep all packing material until the inspection has been completed. If damage is detected, file a claim with carrier immediately and notify the
13