7.0INITIAL STARTUP AND ELECTRICAL CHECKS

Initial Startup and the Configuration Program—The UPS ships with a default 120 VAC L-N setting. This is also the most robust setting in that it can operate with either input phase angle (120 or 180 degrees). Perform initial system checks first. If the UPS configuration needs to be modified for your application, then go to the next section to review use of the configuration program. Some config- uration changes require that the UPS be in the OFF mode while powered from the utility. Therefore, the installer must confirm that the UPS input has been properly wired. After re-configuring your UPS, the UPS may be put into service with the intended loads.

Hardwire Input Connections (For L14-30P Plug-in Connections, skip to 7.1 - L14-30PPlug-in Con- nections—Including the PD-001 Distribution Box.)

! WARNING

Miswiring power to the input terminal block (L1-L2-N-G) or connecting to single phase voltages (L-N-G only) may damage the UPS.

1.Verify that the Input and Output circuit breakers are off.

2.During initial system checks, disconnect all loads (open load disconnects).

3.Inspect all wiring, cables and connection.

4.If external battery cabinets are used, verify that the battery interconnect cables are fully inserted in the sockets. Turn on the battery cabinet circuit breaker now.

5.If you are using a distribution box that includes a manual bypass switch, place the switch in BYPASS position.

6.Turn on the branch circuit disconnect to apply voltage to the input terminal block.

7.Using a voltmeter, verify the expected L1-N, L2-N and L1-L2 voltages.

a.If no manual bypass switch is used, there will be no output voltage at this time. If a manual bypass switch is used, verify that the same voltages appear at the Output terminals. If a manual bypass switch is used, the Bypass lamp will light by the switch. If no manual bypass switch is used, there will be no output voltage at this time.

b.If the configuration program has been used to set the L-N voltage at 100, 110 or 115, then the input phase angle is required to be 180 degrees.

c.If the configuration program as been used to set the L-N voltage at 127 VAC, then the input phase angle is required to be 120 degrees (leading or lagging).

8.After verifying proper input voltage to the UPS terminal block, turn off the branch circuit power, close all access panels to the distribution box and reapply input power.

9.Close the Input circuit breaker located on the distribution box. The green AC Input indicator should illuminate on the front panel.

10.Press the On button for 1 second. The Bypass indicator will light for several seconds before the UPS ON indicator turns on continuously. If the batteries are determined to charged above 80%, an automatic battery test will run for about 15 seconds.

11.Close the Output circuit breaker on the rear of the UPS. If a manual bypass switch is used, the UPS Available indicator by the switch will light. If a manual bypass switch is used, transfer the switch to the UPS position. The output terminal block will be powered at this time.

12.Perform a Manual Battery Test - Press the On button for one (1) second. The front Battery indicator will light for about 15 seconds and then return to only the UPS ON and AC Input indicators being illuminated.

13.Review all setting option provided by the configuration program. Some changes require that the UPS be OFF. If this is the case, these should be programmed before powering the loads. The configuration program is described in the next section.

14.Connect all loads for normal operation.

17

Image 23
Contents GXT2-6000RT208 Power AvailabilityPage Table of Contents Controls and Indicators Configuration ProgramModes of Operation MaintenanceTroubleshooting SpecificationsFigures Important Safety Instructions Page Glossary of Symbols Introduction and System Description System Description Rectifier/Power Factor Correction PFC CircuitBattery Charger InverterDynamic Bypass BatteryDC to DC Converter Major Components Internal Battery PackMain Frame and Electronics PD-001 Removable Power Distribution BoxWHAT’S Included Top bezels Tower use Battery cover grilleGEC connector Mounting hardware Rack mount Handles Configuration Disk Ferrite BeadsAttach Bezels to Top Install the Main CabinetInstallation and Configuration Tower UPS InstallationReturn flanges Retaining Latches Front Innermembers members Installing the Adjustable Rack-Mount Kit-Sold SeparatelyQuantity Rack Depth M4 nuts M4 nutsExternal Battery Cabinet Installation Slide cover over connec- tors Loosen screws to move cover Connect Input/Output PowerReplacing a power distribution box Distribution Box Electrical ConnectionsElectrical requirements-PD-001 4 PD-001 Power Distribution BoxPD-HDWR and PD-HDWR-MBS Terminal Block Connections Electrical requirements-PD-HDWR and PD-HDWR-MBSGround Electrode System or Protective Earth System Install the Grounding Electrode ConductorInstall the Internal Battery Pack Initial Startup and Electrical Checks Initial Startup and Electrical Checks What You Will Need GXT2-6000RT208 Configuration Program FeaturesConfiguration Program Configuration Program-Installation Establishing Communication Link with the UPS Exit Without Changing UPS Settings Configuration Program-OperationRead/Confirm UPS Configuration Settings Changing UPS SettingsN Reverse Detection 120V UPS Models Only UPS TabOutput Voltage Auto RestartFrequency Selection Options TabOptions Tab Used With Earlier GXT 2U Models Battery Cabinets Number Battery TabLow Battery Time Warning Auto Battery Test TimeAbout Tab Horizontal overlay for rack mounting ON/Alarm Silence/Battery Test ButtonControls and Indicators OFF/Bypass ButtonUPS on Indicator Green Battery Level Indicators 5 GreenFault Indicator Red Bypass Indicator AmberModes of Operation Normal Mode OperationBattery Mode Operation Battery Recharge OperationCommunications Snmp Web Card Snmp Adapter Communications Interface PortCommunications 11.1.1 DB-9 Interface PortUPS Intelligent Communications Pin 4 Remote Shutdown on BatteryRepo Connection Remote Emergency Power OffKey to Repo switch connections 1 VDC Sense Ground Battery Cover Captive Screws Front Bezels Battery ReplacementMaintenance Internal Battery Replacement ProceduresConnector Connector cover Cover Electrical connectors UPS ReplacementIndicator status Diagnosis/Audible alarm TroubleshootingFault indicators Condition Alarm Alarm conditionsTroubleshooting guide Problem Cause Solution Only phase angles of 120, 180 or 240 degrees ±10 6000VA Run Time Battery run timesBattery/External Cabinets Load% Minutes Auto-Learning Battery Run Times UPS specifications SpecificationsModel Number Battery specificationsPower distribution box specifications See Battery run timesUsed w/ UPS Model GXT2-6000RT208 Dimensions in mm Product Warranty RegistrationExternal battery cabinet specifications Specifications Page Asia 23F, Allied Kajima Bldg Technical Support/ServiceCompany Behind the Products Locations