Enterasys Networks 2200 manual Troubleshooting

Page 10

3

4

A

INSTALLATION

3.1

Unpacking the Device

3-2

3.2

Installing Options

3-2

3.3

Installing the Device

3-3

 

3.3.1

Tabletop or Shelf Installation

3-3

 

3.3.2

Rackmount Installation

3-4

 

3.3.3

Connecting Power

3-7

3.4

Connecting to the Network

3-8

3.5

Completing the Installation

3-11

TROUBLESHOOTING

4.1

Using LANVIEW

4-1

4.2

Troubleshooting Checklist

4-4

4.3

Using the RESET Button

4-8

SPECIFICATIONS

A.1

Device Specifications

A-1

A.2

Physical Properties

A-1

A.3

Electrical Specifications

A-2

A.4

Environmental Requirements

A-2

A.5

Input/Output Ports

A-2

A.6

COM Port Pinout Assignments

A-3

A.7

Regulatory Compliance

A-3

B

OPTIONAL INSTALLATIONS AND

 

 

MODE SWITCH BANK SETTINGS

 

 

B.1

Required Tools

B-1

 

B.2

Removing the Chassis Cover

B-2

 

B.3

Setting the Mode Switches

B-5

 

B.4

SIMM Upgrade

B-7

 

 

B.4.1 Locating SIMMs

B-7

 

 

B.4.2 Installing the DRAM SIMM

B-8

 

B.5

Installing Optional HSIM or VHSIM Interface Modules

B-9

INDEX

viiiContents

Image 10
Contents 2H258-17R SmartSwitch Installation User’s Guide Page FCC Notice Vcci Notice Industry Canada NoticeClass a ITE Notice Bsmi EMC Statement Taiwan Enterasys NETWORKS, INC Program License Agreement You and Enterasys agree as followsPage Page Declaration of Conformity Contents Troubleshooting Figures Tables About This Guide Using this GuideStructure of this Guide Related Documents Document Conventions This guide uses the following conventionsPage Introduction OverviewConnectivity Runtime IP Address DiscoverySmartTrunk Full Duplex Switched EthernetRemote Monitoring Rmon Port/VLAN Redirect Functions Broadcast SuppressionTraffic Rate Limiting Flow Control Garp Switch Operation11 802.1 Port Priority Optional HSIMs and VHSIMs Switching OptionsManagement Standards CompatibilityLanview Diagnostic LEDs Getting HelpPage Network Requirements 100BASE-FX NetworkPage Installation Installing Options Unpacking the DeviceInstalling the Device Tabletop or Shelf InstallationRackmount Installation Guidelines for the Rackmount InstallationStrain-Relief Bracket Screws Rack Mounting the 2H258-17R Connecting Power Installing the Device in a RackConnecting to the Network Redundant Primary AC outlets are On separate circuitsConnecting to the Network Fiber Optic Connection Completing the Installation Page Troubleshooting Using LanviewPWR CPU Troubleshooting Checklist OFFRefer to the SmartSwitch Series 2E253 2E253, 2H252, 2H253, and 2H258 Local User parameters Using the Reset Button Reset ButtonDevice Specifications SpecificationsPhysical Properties Environmental Requirements Electrical SpecificationsINPUT/OUTPUT Ports COM Port Pinout Assignments Regulatory CompliancePage Optional Installations Mode Switch Bank Settings Required ToolsRemoving the Chassis Cover Optional Installations and Mode Switch Bank Settings B-3 Figure B-1 Removing the Chassis Cover Setting the Mode Switches Figure B-2 Mode Switch Location6Optional Installations and Mode Switch Bank Settings Simm Upgrade Locating SIMMsInstalling the Dram Simm Installing Optional Hsim or Vhsim Interface Modules Figure B-5 Hsim and Vhsim Connector LocationsPage Index NumericsIndex-2