Enterasys Networks 2200 manual Installation

Page 27

3

Installation

ELECTRICAL HAZARD: Only qualified personnel should install the 2H258-17R.

NOTE: Read the Release Notes shipped with the device to check for any exceptions to the supported features and operation documented in this guide.

This chapter provides the instructions required to install the 2H258-17R. A Phillips screwdriver is required to install options into the device or install the device into a rack. Follow the order of the sections listed below to correctly install the device.

Unpacking the Device (Section 3.1)

Installing Options (Section 3.2)

Installing the Device (on a shelf or tabletop, or into a standard rack) (Section 3.3)

Connecting to the Network (Section 3.4)

Completing the Installation (Section 3.5)

Installation 3-1

Image 27
Contents 2H258-17R SmartSwitch Installation User’s Guide Page FCC Notice Industry Canada Notice Vcci NoticeClass a ITE Notice Bsmi EMC Statement Taiwan You and Enterasys agree as follows Enterasys NETWORKS, INC Program License AgreementPage Page Declaration of Conformity Contents Troubleshooting Figures Tables Using this Guide About This GuideStructure of this Guide Related Documents This guide uses the following conventions Document ConventionsPage Overview IntroductionRuntime IP Address Discovery ConnectivityFull Duplex Switched Ethernet SmartTrunkRemote Monitoring Rmon Broadcast Suppression Port/VLAN Redirect FunctionsTraffic Rate Limiting Garp Switch Operation Flow Control11 802.1 Port Priority Standards Compatibility Switching OptionsManagement Optional HSIMs and VHSIMsGetting Help Lanview Diagnostic LEDsPage 100BASE-FX Network Network RequirementsPage Installation Unpacking the Device Installing OptionsTabletop or Shelf Installation Installing the DeviceGuidelines for the Rackmount Installation Rackmount InstallationStrain-Relief Bracket Screws Rack Mounting the 2H258-17R Installing the Device in a Rack Connecting PowerRedundant Primary AC outlets are On separate circuits Connecting to the NetworkConnecting to the Network Fiber Optic Connection Completing the Installation Page Using Lanview TroubleshootingPWR CPU OFF Troubleshooting ChecklistRefer to the SmartSwitch Series 2E253 2E253, 2H252, 2H253, and 2H258 Local User parameters Reset Button Using the Reset ButtonSpecifications Device SpecificationsPhysical Properties Electrical Specifications Environmental RequirementsINPUT/OUTPUT Ports Regulatory Compliance COM Port Pinout AssignmentsPage Required Tools Optional Installations Mode Switch Bank SettingsRemoving the Chassis Cover Optional Installations and Mode Switch Bank Settings B-3 Figure B-1 Removing the Chassis Cover Figure B-2 Mode Switch Location Setting the Mode Switches6Optional Installations and Mode Switch Bank Settings Locating SIMMs Simm UpgradeInstalling the Dram Simm Figure B-5 Hsim and Vhsim Connector Locations Installing Optional Hsim or Vhsim Interface ModulesPage Numerics IndexIndex-2