Enterasys Networks 2200 manual Guidelines for the Rackmount Installation

Page 30

Installing the Device

Figure 3-1 Tabletop or Shelf Installation

B

C

 

FAST ETHERNET WORKGROUP SWITCH

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RX

TX RX

TX RX TX

RX

TX RX

TX RX

TX RX

TX RX TX RX

TX RX TX RX TX RX TX RX TX RX TX RX TX RX TX

A

 

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

 

 

 

PWR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2H258-17R

RESET

 

CPU

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A = 15 cm (6 in)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

D

 

B = 57 cm (22.5 in)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C = 53 cm (21 in)

D = 213 cm (7 ft)

3068-02

3.3.2Rackmount Installation

To install the 2H258-17R in a 19-inch rack, Enterasys Networks includes a strain-relief bracket for cable management and an accessory kit containing the rackmount brackets, and mounting screws to attach the rackmount brackets and strain-relief bracket.

Guidelines for the Rackmount Installation

The installation site must be within reach of the network cabling and meet the requirements listed below:

An appropriate grounded power receptacle must be located within seven feet of the location.

Maintain a temperature of between 5°C (41°F) and 40°C (104°F) at the installation site with fluctuations of less than 10°C (18°F) per hour.

CAUTION: To ensure proper ventilation and prevent overheating, leave a minimum clearance space of 5.1 cm (2.0 in) at the left, right, and rear of the 2H258-17R.

WARNING: Before installing the 2H258-17R into a rack, ensure that the rack supports the device(s) without compromising the stability of the rack. Otherwise, personal injury and/or equipment damage may result.

3-4Installation

Image 30
Contents 2H258-17R SmartSwitch Installation User’s Guide Page FCC Notice Industry Canada Notice Vcci NoticeClass a ITE Notice Bsmi EMC Statement Taiwan Enterasys NETWORKS, INC Program License Agreement You and Enterasys agree as followsPage Page Declaration of Conformity Contents Troubleshooting Figures Tables Using this Guide About This GuideStructure of this Guide Related Documents Document Conventions This guide uses the following conventionsPage Introduction OverviewConnectivity Runtime IP Address DiscoveryFull Duplex Switched Ethernet SmartTrunkRemote Monitoring Rmon Broadcast Suppression Port/VLAN Redirect FunctionsTraffic Rate Limiting Garp Switch Operation Flow Control11 802.1 Port Priority Optional HSIMs and VHSIMs Switching OptionsManagement Standards CompatibilityLanview Diagnostic LEDs Getting HelpPage Network Requirements 100BASE-FX NetworkPage Installation Installing Options Unpacking the DeviceInstalling the Device Tabletop or Shelf InstallationRackmount Installation Guidelines for the Rackmount InstallationStrain-Relief Bracket Screws Rack Mounting the 2H258-17R Connecting Power Installing the Device in a RackConnecting to the Network Redundant Primary AC outlets are On separate circuitsConnecting to the Network Fiber Optic Connection Completing the Installation Page Troubleshooting Using LanviewPWR CPU Troubleshooting Checklist OFFRefer to the SmartSwitch Series 2E253 2E253, 2H252, 2H253, and 2H258 Local User parameters Using the Reset Button Reset ButtonSpecifications Device SpecificationsPhysical Properties Electrical Specifications Environmental RequirementsINPUT/OUTPUT Ports COM Port Pinout Assignments Regulatory CompliancePage Optional Installations Mode Switch Bank Settings Required ToolsRemoving the Chassis Cover Optional Installations and Mode Switch Bank Settings B-3 Figure B-1 Removing the Chassis Cover Setting the Mode Switches Figure B-2 Mode Switch Location6Optional Installations and Mode Switch Bank Settings Simm Upgrade Locating SIMMsInstalling the Dram Simm Installing Optional Hsim or Vhsim Interface Modules Figure B-5 Hsim and Vhsim Connector LocationsPage Index NumericsIndex-2