Enterasys Networks 2200 manual Connecting to the Network

Page 34

Connecting to the Network

Figure 3-5 2H258-17R Rear View

Redundant

Primary

AC outlets are

 

on separate circuits

26001-06

2.Observe the LANVIEW LEDs. After a successful boot, the PWR LED turns ON (green). If the PWR LED is amber, there is no power redundancy. Check the power cord connections and the power source. If there are no problems with the power cord connections or power source and the PWR LED is still amber, contact Enterasys Networks. Refer to Section 1.2 for details.

3.4CONNECTING TO THE NETWORK

This section provides the procedures for connecting fiber optic segments from the network or other devices to the 2H258-17R.

NOTE: If the 2H258-17R is being installed in a network using SmartTrunking, there are rules concerning the network cable and port configurations that must be followed for SmartTrunking to operate properly. Before connecting the cables, refer to the SmartTrunk User’s Guide for the configuration information.

Ports 1 through 16 on the 2H258-17R have MT-RJ connectors for multimode fiber optic cable connections.

3-8Installation

Image 34
Contents 2H258-17R SmartSwitch Installation User’s Guide Page FCC Notice Vcci Notice Industry Canada NoticeClass a ITE Notice Bsmi EMC Statement Taiwan Enterasys NETWORKS, INC Program License Agreement You and Enterasys agree as followsPage Page Declaration of Conformity Contents Troubleshooting Figures Tables About This Guide Using this GuideStructure of this Guide Related Documents Document Conventions This guide uses the following conventionsPage Introduction OverviewConnectivity Runtime IP Address DiscoverySmartTrunk Full Duplex Switched EthernetRemote Monitoring Rmon Port/VLAN Redirect Functions Broadcast SuppressionTraffic Rate Limiting Flow Control Garp Switch Operation11 802.1 Port Priority Optional HSIMs and VHSIMs Switching OptionsManagement Standards CompatibilityLanview Diagnostic LEDs Getting HelpPage Network Requirements 100BASE-FX NetworkPage Installation Installing Options Unpacking the DeviceInstalling the Device Tabletop or Shelf InstallationRackmount Installation Guidelines for the Rackmount Installation Strain-Relief Bracket Screws Rack Mounting the 2H258-17R Connecting Power Installing the Device in a RackConnecting to the Network Redundant Primary AC outlets are On separate circuitsConnecting to the Network Fiber Optic Connection Completing the Installation Page Troubleshooting Using LanviewPWR CPU Troubleshooting Checklist OFFRefer to the SmartSwitch Series 2E253 2E253, 2H252, 2H253, and 2H258 Local User parameters Using the Reset Button Reset ButtonDevice Specifications SpecificationsPhysical Properties Environmental Requirements Electrical SpecificationsINPUT/OUTPUT Ports COM Port Pinout Assignments Regulatory CompliancePage Optional Installations Mode Switch Bank Settings Required ToolsRemoving the Chassis Cover Optional Installations and Mode Switch Bank Settings B-3 Figure B-1 Removing the Chassis Cover Setting the Mode Switches Figure B-2 Mode Switch Location6Optional Installations and Mode Switch Bank Settings Simm Upgrade Locating SIMMsInstalling the Dram Simm Installing Optional Hsim or Vhsim Interface Modules Figure B-5 Hsim and Vhsim Connector LocationsPage Index NumericsIndex-2