Enterasys Networks 2200 manual Optional Installations and Mode Switch Bank Settings B-3

Page 53

Removing the Chassis Cover

To remove the chassis cover, proceed as follows:

1.Disconnect the 2H258-17R from the network as follows: a. Unplug both power cords from the rear of the chassis.

ELECTRICAL HAZARD: TURN OFF THE 2H258-17R BY UNPLUGGING THE POWER CORD FROM THE REAR OF THE CHASSIS.

AM HINTEN DES 2H258-17R STECHEI ABZIEHEN UM AUS ZU SCHALTEN.

APAGUE EL 2H258-17R DESENCHUFE EL CABLE DE LA UNIDAD.

TIP: Before performing step b, mark the cables connected to the 2H258-17R according to their associated port numbers. This is recommended for ease of reinstallation.

b. Disconnect all network cables attached to the 2H258-17R.

2.If the 2H258-17R is rack mounted, remove it from the rack and remove the rackmount brackets (refer to Chapter 3).

3.Use a Phillips screwdriver to remove the four screws attaching the cover to the chassis. (See Figure B-1.)

4.Remove the cover by sliding it back until it clears the front of the chassis and then lifting it straight up and off the chassis.

To reinstall the chassis cover, perform the removal procedures in reverse.

Optional Installations and Mode Switch Bank Settings B-3

Image 53
Contents 2H258-17R SmartSwitch Installation User’s Guide Page FCC Notice Class a ITE Notice Bsmi EMC Statement Taiwan Industry Canada NoticeVcci Notice You and Enterasys agree as follows Enterasys NETWORKS, INC Program License AgreementPage Page Declaration of Conformity Contents Troubleshooting Figures Tables Structure of this Guide Using this GuideAbout This Guide Related Documents This guide uses the following conventions Document ConventionsPage Overview IntroductionRuntime IP Address Discovery ConnectivityRemote Monitoring Rmon Full Duplex Switched EthernetSmartTrunk Traffic Rate Limiting Broadcast SuppressionPort/VLAN Redirect Functions 11 802.1 Port Priority Garp Switch OperationFlow Control Management Switching OptionsOptional HSIMs and VHSIMs Standards CompatibilityGetting Help Lanview Diagnostic LEDsPage 100BASE-FX Network Network RequirementsPage Installation Unpacking the Device Installing OptionsTabletop or Shelf Installation Installing the DeviceGuidelines for the Rackmount Installation Rackmount InstallationStrain-Relief Bracket Screws Rack Mounting the 2H258-17R Installing the Device in a Rack Connecting PowerRedundant Primary AC outlets are On separate circuits Connecting to the NetworkConnecting to the Network Fiber Optic Connection Completing the Installation Page Using Lanview TroubleshootingPWR CPU OFF Troubleshooting ChecklistRefer to the SmartSwitch Series 2E253 2E253, 2H252, 2H253, and 2H258 Local User parameters Reset Button Using the Reset ButtonPhysical Properties SpecificationsDevice Specifications INPUT/OUTPUT Ports Electrical SpecificationsEnvironmental Requirements Regulatory Compliance COM Port Pinout AssignmentsPage Required Tools Optional Installations Mode Switch Bank SettingsRemoving the Chassis Cover Optional Installations and Mode Switch Bank Settings B-3 Figure B-1 Removing the Chassis Cover Figure B-2 Mode Switch Location Setting the Mode Switches6Optional Installations and Mode Switch Bank Settings Locating SIMMs Simm UpgradeInstalling the Dram Simm Figure B-5 Hsim and Vhsim Connector Locations Installing Optional Hsim or Vhsim Interface ModulesPage Numerics IndexIndex-2