Enterasys Networks 2200 manual Unpacking the Device, Installing Options

Page 28

Unpacking the Device

3.1UNPACKING THE DEVICE

Unpack the device as follows:

1.Open the box and remove the packing material protecting the 2H258-17R.

2.Verify the contents of the carton as listed in Table 3-1.

Table 3-1 Contents of 2H258-17R Carton

Item

Quantity

 

 

2H258-17R

1

 

 

Antistatic Wrist Strap

1

 

 

Console Cable Kit

1

 

 

Rackmount Kit

1

 

 

Strain-Relief Bracket

1

 

 

Manual Accessory Kit

1

 

 

Power Cord

2

 

 

3.Remove the tape seal on the non-conductive bag to remove the 2H258-17R.

4.Perform a visual inspection of the device for any signs of physical damage. Contact Enterasys Networks if there are any signs of damage. Refer to Section 1.2 for details.

3.2INSTALLING OPTIONS

NOTE: Install any optional equipment before proceeding to Section 3.3.

If the 2H258-17R is to be installed with an optional HSIM or VHSIM, refer to the user’s guide of that device for the installation instructions.

3-2Installation

Image 28
Contents 2H258-17R SmartSwitch Installation User’s Guide Page FCC Notice Vcci Notice Industry Canada NoticeClass a ITE Notice Bsmi EMC Statement Taiwan Enterasys NETWORKS, INC Program License Agreement You and Enterasys agree as followsPage Page Declaration of Conformity Contents Troubleshooting Figures Tables About This Guide Using this GuideStructure of this Guide Related Documents Document Conventions This guide uses the following conventionsPage Introduction OverviewConnectivity Runtime IP Address DiscoverySmartTrunk Full Duplex Switched EthernetRemote Monitoring Rmon Port/VLAN Redirect Functions Broadcast SuppressionTraffic Rate Limiting Flow Control Garp Switch Operation11 802.1 Port Priority Switching Options ManagementOptional HSIMs and VHSIMs Standards CompatibilityLanview Diagnostic LEDs Getting HelpPage Network Requirements 100BASE-FX NetworkPage Installation Installing Options Unpacking the DeviceInstalling the Device Tabletop or Shelf InstallationRackmount Installation Guidelines for the Rackmount InstallationStrain-Relief Bracket Screws Rack Mounting the 2H258-17R Connecting Power Installing the Device in a RackConnecting to the Network Redundant Primary AC outlets are On separate circuitsConnecting to the Network Fiber Optic Connection Completing the Installation Page Troubleshooting Using LanviewPWR CPU Troubleshooting Checklist OFFRefer to the SmartSwitch Series 2E253 2E253, 2H252, 2H253, and 2H258 Local User parameters Using the Reset Button Reset ButtonDevice Specifications SpecificationsPhysical Properties Environmental Requirements Electrical SpecificationsINPUT/OUTPUT Ports COM Port Pinout Assignments Regulatory CompliancePage Optional Installations Mode Switch Bank Settings Required ToolsRemoving the Chassis Cover Optional Installations and Mode Switch Bank Settings B-3 Figure B-1 Removing the Chassis Cover Setting the Mode Switches Figure B-2 Mode Switch Location6Optional Installations and Mode Switch Bank Settings Simm Upgrade Locating SIMMsInstalling the Dram Simm Installing Optional Hsim or Vhsim Interface Modules Figure B-5 Hsim and Vhsim Connector LocationsPage Index NumericsIndex-2