Enterasys Networks 2200 manual Figure B-1 Removing the Chassis Cover

Page 54

Removing the Chassis Cover

Figure B-1 Removing the Chassis Cover

Screws (4)

Chassis Cover

Front Panel

Chassis

Note: If the device was rack mounted, the four screws fastening the cover to the front panel are removed and installed along with the rackmount brackets.

2504-30

B-4Optional Installations and Mode Switch Bank Settings

Image 54
Contents 2H258-17R SmartSwitch Installation User’s Guide Page FCC Notice Industry Canada Notice Vcci NoticeClass a ITE Notice Bsmi EMC Statement Taiwan Enterasys NETWORKS, INC Program License Agreement You and Enterasys agree as followsPage Page Declaration of Conformity Contents Troubleshooting Figures Tables Using this Guide About This GuideStructure of this Guide Related Documents Document Conventions This guide uses the following conventionsPage Introduction OverviewConnectivity Runtime IP Address DiscoveryFull Duplex Switched Ethernet SmartTrunkRemote Monitoring Rmon Broadcast Suppression Port/VLAN Redirect FunctionsTraffic Rate Limiting Garp Switch Operation Flow Control11 802.1 Port Priority Optional HSIMs and VHSIMs Switching OptionsManagement Standards CompatibilityLanview Diagnostic LEDs Getting HelpPage Network Requirements 100BASE-FX NetworkPage Installation Installing Options Unpacking the DeviceInstalling the Device Tabletop or Shelf InstallationRackmount Installation Guidelines for the Rackmount InstallationStrain-Relief Bracket Screws Rack Mounting the 2H258-17R Connecting Power Installing the Device in a RackConnecting to the Network Redundant Primary AC outlets are On separate circuitsConnecting to the Network Fiber Optic Connection Completing the Installation Page Troubleshooting Using LanviewPWR CPU Troubleshooting Checklist OFFRefer to the SmartSwitch Series 2E253 2E253, 2H252, 2H253, and 2H258 Local User parameters Using the Reset Button Reset ButtonSpecifications Device SpecificationsPhysical Properties Electrical Specifications Environmental RequirementsINPUT/OUTPUT Ports COM Port Pinout Assignments Regulatory CompliancePage Optional Installations Mode Switch Bank Settings Required ToolsRemoving the Chassis Cover Optional Installations and Mode Switch Bank Settings B-3 Figure B-1 Removing the Chassis Cover Setting the Mode Switches Figure B-2 Mode Switch Location6Optional Installations and Mode Switch Bank Settings Simm Upgrade Locating SIMMsInstalling the Dram Simm Installing Optional Hsim or Vhsim Interface Modules Figure B-5 Hsim and Vhsim Connector LocationsPage Index NumericsIndex-2