Data Power Solutions Quick Start Guide
Inspecting the Equipment and Reporting Damage
•Unpack the APS dc power system and inspect it carefully for possible damage that may have occurred while in transit.
•Next, check the equipment against the packing list (supplied with the equipment) and ensure that you have received the correct type of Access Power Rectifiers (either APR48 or APU48).
•Report any damage or incorrect shipment immediately, using a completed Equipment Incident Report (at the back of this guide) to supply all relevant details. Fax the completed form to your local Eaton dc product representative.
•Keep the original packaging. You will need it if any equipment needs to be returned to your local Eaton dc product representative.
Installation
Mounting the APS DC Power System
Location and Environment
APS dc power systems
•
•Desktop Versions:
The location must provide adequate airflow around the unit, (as per Clearance Requirements below) in an atmosphere free from excessive dust, corrosive fumes, or conductive contaminants.
Dust
Important Notes for Rack Mounted Systems
•If this dc power system is installed in a closed or
•Ensure that the air flow is not restricted.
•Ensure that the system's weight is adequately and evenly supported.
•Take note of the maximum ac current stated on the nameplate. Ensure that the ac supply is correctly rated.
•Ensure that reliable earthing is maintained. Carefully check earth continuity from the branch circuit to the dc power system.
14 | Copyright © | |
10640205 February 2009 | ||
|