Low Voltage Disconnect (if applicable)

APS3-059, APS3-061 and APS6-059 dc power systems are equipped with a Low Voltage Disconnect (LVD) module. The LVD disconnects the batteries at the LVD disconnect voltage to prevent damage to the batteries due to excessive deep discharge. After the batteries are disconnected, they recover to their open-circuit voltage. The LVD reconnects the batteries automatically after the ac supply is restored. After the batteries are reconnected, the APS dc power system recharges the batteries and powers the loads.

Both the LVD disconnect and reconnect voltages are configurable. The default LVD disconnect voltage is set to 44V and the reconnect voltage to 48V. This hysteresis band ensures that the open-circuit recovery of the discharged batteries does not rise above the LVD reconnect voltage.

Pre-Installation

Warnings

This section contains important warnings relating to:

Inputs

Equipment Classification

Outputs

Batteries (if applicable)

Rectifiers

Location and Environment

Servicing

EMC Compliance

Inputs

Desktop Versions:

Pluggable Type A: Except for 120V input, if APS3-06X power systems are fitted with three rectifiers, then only two ac power cords may be connected to one building branch circuit. The third ac power cord must be connected to a separate building branch circuit. Failure to do so voids all safety approvals.

The maximum earth leakage current of each Access Power Rectifier is 1.5 mA. Ensure that any upstream Residual Current Devices (RCDs) are appropriately rated.

The ac power cords (supplying the power system) must be suitably rated for the environment and ac power distribution system. In addition, these ac power cords must be approved and installed to comply with local wiring regulations.

The earth conductor of each ac power cord must have a minimum cross sectional area of 1 mm2 (0.00155 in2).

The maximum length of each ac power cord should not exceed 3m (10 feet), unless local wiring regulations permit otherwise.

Ensure that the ac supply is disconnected from those fused ac power sockets before checking or replacing their respective fuses.

Each socket, K1 to K3 (APS3), and K1 to K6 (APS6), contain two fuses, FS1 and FS2.

CAUTION: DOUBLE-POLE / NEUTRAL FUSING

Use only 15 A, 250 VAC, 6.3 x 32 mm, fast-acting fuses of the same type (Bussman ABC-15 or Littelfuse 314- 015 Type 3AB) for continued protection against risk of fire.

6

Copyright © 2006-2009 Eaton Corporation. All Rights Reserved.

10640205 February 2009

 

Image 6
Contents Data Power Solutions Quick Start Guide Data Power Solutions Quick Start Guide Contents Worldwide Support For Further Information and Technical AssistanceGeneral Description APS3 and APS6 Series 48V DC Power SystemsAccess Power Rectifiers SM45 Supervisory ModulePre-Installation Low Voltage Disconnect if applicableInputs Data Power Solutions Quick Start Guide Entrées Alimentation Secteur Wechselspannungs-EingängeIngressi C.A Equipment ClassificationOutputs Entradas CABatteries if applicable RectifiersRaddrizzatori RedresseursGleichrichter RectificadoresLocation and Environment ServicingEntretien Manutenzione EMC ComplianceWartung ReparacionesInspecting the Equipment and Reporting Damage InstallationMounting the APS DC Power System Location and Environment Important Notes for Rack Mounted SystemsRemarques importantes pour les systèmes montés dans un rack Wichtige Hinweise für Anlagen mit SchrankmontageConnecting the DC Load Cables DC Load Cable SpecificationsClearance Requirements Page Fit cable and sleeves Fit load cable clampsStrip cable ends Terminate cablesBattery Location Installing the External Batteries if applicableBattery Sizing Arrange sleeves and tighten clamp screwsBattery Fault Protection Protection en cas de défaut de la batterie BatterieschutzPrepare cable clamp Battery Cable SpecificationsBefore You Start Strip cable and fit sleeveTerminate cable Arrange sleeve and clamp the battery cablesRepeat for other battery cables if required Remove knockout and fit coverConnecting the APS DC Power System to the AC Supply Connecting the Battery Temperature Sensor CableMounting the Battery Temperature Sensor AC Supply RequirementsPre-Power-Up Check AC InstallationInserting the Access Power Rectifiers CommissioningApplying AC Power Configuring the APS DC Power System for OperationApplying DC Power to the Load UL Listed Mark Output Circuit Breaker Field Replacement and RepairBattery Input Circuit Breakers Desktop variants APS3-060 & APS3-061System Output SpecificationsSystem Input EnvironmentDimensions H, W, D WeightRectifiers