American Power Conversion DC Series Rear Access Alarms, Front Access Alarms Knockout Panels

Page 14

2.4.2Rear Access Alarms

To access the alarm outputs first ensure batteries are disconnected from the system by setting battery connection switch to “OFF” via controller front panel (see section 2.3) and by turning the external battery breaker off. The input mains supply must then be turned off by operating the local isolator or disconnection device. Remove the rear cover to leave the view as shown below. Labelled are the 3 signal output connectors SK14, SK17 and SK18 and also the temperature compensation connector SK19, where a thermistor is wired.

To use a particular alarm signal simply strip the ends of your alarm cables and enter into connectors by pushing down on respective lever, push in alarm cable and release lever to clamp cable. Cables should be routed through one of the knockout panels in the side of the shelf.

SK19

SK14

SK17

SK18

2.4.3Front Access Alarms

Knockout

panels

 

 

The front access alarms are

 

 

available from a 25 way ‘D’

 

 

connector socket (SK4) mounted

DISTRIBUTION

 

in the controller front panel.

1

 

 

 

 

2

 

 

3

 

 

4

 

 

1

 

Alarms socket SK4

 

 

2

 

 

3

 

 

4

 

 

 

 

 

User Manual 990-9178A

Page 14 of 44

18th FEB 02

DC MX06 40A Shelf

Image 14
Contents DC Series MX06 40A Shelf DC MX06 40A Shelf Contents Issue Record Introduction Safety PrecautionsGeneral Information Types of Hazards CEC Code C22.1-98 CanadaVisible External Damage Inspection upon Receipt of GoodsGeneral Concealed DamageAPC Worldwide Customer Support Warranty Limitations Warranty InformationLimited Warranty Rectifier Parameter per rectifier 1TWF0500H54 SpecificationProduct Overview and Technical Description Display + LED’s SK10 Alarm Card LayoutController SK11Access AlarmsAvailable Alarms Rear Access Alarms Front Access Alarms Knockout PanelsMajor and Minor Alarms Alarm Description Major alarm Minor alarm SelectionOutput Voltage Programming Customer InputsCurrent Limit Programming Battery Test Function Input Description Location Enable Function Input Description LocationTemperature Compensation Input Description Socket Pin System ControllerMechanical DimensionsWeight Mounting Options Schematic Positive Earth ConfiguredNegative Earth Configured DCM00K02W482 System ConfigurationDCM00K02W481 DCM00K02W483Rear Access Connection Installation ProcedureSingle Phase AC Primary SupplyFront Access Connection Terminal Block Cable GlandSingle Phase, AB Feed Front Access Connection 3 3 Phase Star Supply Front access connection 4 3 Phase Delta Supply Front access connection 1 10 GMT Fuses Rear Access DC DistributionAmbient Temperature 2 10 GMT Fuses Front Access3 4 Circuit Breakers Rear Access 4 4 Circuit Breakers Front Access 5 4 Cartridge Fuses Rear Access 6 4 Cartridge Fuses Front AccessRouting Of Cables Input cablesOutput Cables LVD Function External Battery InstallationBattery Back-up function Battery Connection Diagram System Output EarthingGeneral Powering up the MX06 40A ShelfCommissioning the System Method Manual Handling ProcedurePreparation Fault Finding / Symptoms Fault SymptomsController replacement Service, Accessories & SparesRectifier replacement