American Power Conversion DC Series user manual Routing Of Cables, Input cables

Page 37

4.3 Routing Of Cables

4.3.1Input cables

One or more of the top 3 knockouts (top left hand side knockout and 2 actually in the rear cover) must be used for entry of the input AC cable. This is essential if the input cabling used is not double insulated and recommended as this optimises the EMC performance by ensuring the AC Input cables are as far away from the output wiring as possible. Cables should be routed as near the top of the system as possible using the cable clips provided, with big loops of cable inside the shelf being avoided.

300mm of cable protector grommet strip supplied. Simply cut into required lengths and fit around edge of knockout holes (as shown below)

Top 3 Knockouts

Cable protector grommet

AC Input Cable

Note/ This picture does not show a 40A Shelf and is to be used only as an example of how to use the grommet strip as cable protection.

User Manual 990-9178A

Page 37 of 44

18th FEB 02

DC MX06 40A Shelf

Image 37
Contents DC Series MX06 40A Shelf DC MX06 40A Shelf Contents Issue Record General Information Safety PrecautionsIntroduction CEC Code C22.1-98 Canada Types of HazardsGeneral Inspection upon Receipt of GoodsVisible External Damage Concealed DamageAPC Worldwide Customer Support Limited Warranty Warranty InformationWarranty Limitations Product Overview and Technical Description SpecificationRectifier Parameter per rectifier 1TWF0500H54 Display + LED’s Controller Alarm Card LayoutSK10 SK11Available Alarms AlarmsAccess Front Access Alarms Knockout Panels Rear Access AlarmsAlarm Description Major alarm Minor alarm Selection Major and Minor AlarmsCurrent Limit Programming Customer InputsOutput Voltage Programming Enable Function Input Description Location Battery Test Function Input Description LocationSystem Controller Temperature Compensation Input Description Socket PinWeight DimensionsMechanical Mounting Options Positive Earth Configured SchematicNegative Earth Configured DCM00K02W481 System ConfigurationDCM00K02W482 DCM00K02W483Single Phase Installation ProcedureRear Access Connection AC Primary SupplyTerminal Block Cable Gland Front Access ConnectionSingle Phase, AB Feed Front Access Connection 3 3 Phase Star Supply Front access connection 4 3 Phase Delta Supply Front access connection DC Distribution 1 10 GMT Fuses Rear Access2 10 GMT Fuses Front Access Ambient Temperature3 4 Circuit Breakers Rear Access 4 4 Circuit Breakers Front Access 6 4 Cartridge Fuses Front Access 5 4 Cartridge Fuses Rear AccessInput cables Routing Of CablesOutput Cables Battery Back-up function External Battery InstallationLVD Function System Output Earthing Battery Connection DiagramCommissioning the System Powering up the MX06 40A ShelfGeneral Preparation Manual Handling ProcedureMethod Fault Symptoms Fault Finding / SymptomsRectifier replacement Service, Accessories & SparesController replacement