3. Installation
3. Installation
3.1 Unpacking
OP1 | 1 unit |
Mounting metal hasp | 4 units |
Connection cable (3 m) | 1 unit |
Bypass Plug (install on body) | 1 unit |
3.2Installation
3.2.1Gasket
Applicable model:
Even in environment that do not require
Precautions When Handling the Gasket
-Before you install the Operator Panel, make sure that the gasket is attached to the Operator Panel.
-Gasket that is used for long periods of time or once has been installed on the panel is scratched or dirty, and may not qualify IP65
-Do not insert the seams of the gasket at the corners of the Operator Panel. Inserting the seams of the gasket at the corners of the Operator Panel may cause a tensile force to the seams and the gasket may be torn.
-To ensure stable
Gasket
OP1 Rev.1a | 9 |