Epson RC170 manual Regular Maintenance Inspection, Backlight Replacement, Maintenance Parts List

Page 44

6. Maintenance and Inspection

6.6 Regular Maintenance Inspection

Performing the maintenance inspection in accordance with the schedule is essential to use the Operator Panel in the best condition.

Inspection point of the ambient environment

 

- Is the ambient temperature suitable?

5 to 40 degC

-

Is the ambient relative humidity suitable?

20 to 80%RH

-

Does not corrosive gas exist?

 

Inside the Controller Box is the ambient environment for installation inside the Controller Box.

Inspection point at installation

-Is the connection cable connector connected completely?

-Is not the connection cable connector loose?

-Is the mounting metal hasp mounting securely?

-Is not obvious scratches or dirt seen on the gasket?

6.7Backlight Replacement

The backlight of the Operator Panel display cannot be replaced be users. Please contact us for backlight replacement.

6.8 Maintenance Parts List

Part Name

Code

Standard

 

 

 

OP1 type A (Euro-American specification

R12B120001

OP1TypeA

 

 

 

OP1 type B (Japanese specification)

R12B120002

OP1TypeB

OP1 cable 3m

R13B020009

OP1_Cable3M

 

 

 

OP1 gasket

R13B031222

OP1_Gasket01

 

 

 

36

OP1 Rev.1a

Image 44
Contents OP1 RC170 Option Operator Panel OP1 Rev.1a OP1 RC170 Option Operator PanelForeword Trademarks Before Reading This Manual Manufacturer & SupplierTable of Contents Programming for Operator Panel Safety Safety PrecautionsSafety ConventionsPage Pendant to the Controller How to Reset an Emergency Stop StateEmergency Stop Specifications Specification TablesElectrical Specifications Environmental SpecificationsFunction switches Emergency Stop switchPart Names and Functions Touch PanelSpecifications Power Lamp Teach Pendant connector Bypass PlugHcom connector Tool connectorExternal appearance with mounting metal hasps Appearance and DimensionsAppearance without mounting metal hasps Panel Cutout Dimensions Mounting Metal Hasps DimensionsInstallation InstallationUnpacking GasketMounting Holes Installing Operator Panel Connecting Cables Teach Pendant Connection Operation OperationBasic Operations Startup screen Startup ScreenOperator Panel screen image Program Execution Screen Operation Serious Error state Error stateHow to set the Operator Panel to a control device Program numberCancel program ResetExecute program Pause programTask Monitor Screen I/O Monitor Screen Monitor screen 32-bit display OP1 Rev.1aOperation Monitor screen 8-bit display System History Screen Application Screen Application screen numerical value input Application screen text string inputSetup Screen Startup screen Setup screen LanguageOperation Change display after program execution Programming for Operator Panel Display on Operator PanelSimple Display Program Programming for Operator PanelDisplay Device Executing the display device selection commandData Input from Operator Panel Value Input String Input About Display Language Maintenance and Inspection Maintenance and InspectionContrast Adjustment Brightness Adjustment Firmware Update Case and Display CleaningReplacement Procedure About GasketGasket evenly sticking out Approximately 3.0 mm from the groove OP1 Rev.1aMaintenance Parts List Regular Maintenance InspectionBacklight Replacement