Scheduling receptacles by day of the week
There are two types of schedules that you can set up for one day of the week. The two setup procedures are described below.
All receptacles on and off:
Follow this procedure to select both the powering on and powering off times for all desired receptacles on one day of the week.
1.Click on a day of the week at the top of a column in the scheduling table. Two Set Schedule For sections open, one for Power On and one for Power Off. These sections contain
Figure 21. Schedule Screen Showing Fields for Daily Receptacle Scheduling
2.In either the Power On or Off section, select the hours, minutes, and AM or PM from the menus; and select the check boxes for the receptacles that you want to schedule.
3.In the section in which you made your selections, click Set to enter your choices. The section closes.
4.If desired, repeat steps 2 and 3 in the other Set Schedule For section.
If you do not want to make selections in the remaining Set Schedule For section, click Refresh to close the section.
NOTE: If you do not click Set before making any selections in the other field, the second field selections override those that you entered in the first.
5.Repeat steps 1 through 4 for any additional days that you want to schedule.
IPL T PCS4 • HTML Configuration and Control 32