FastIron GS Compact Layer 2 Switch Hardware Installation Guide
You will need the following tools to perform these procedures:
•#2
Installing an AC Power Supply
WARNING: Before beginning the installation, see the precautions in “Power Supply Precautions” on page
Use the following procedures for installing AC power supplies in the FastIron GS.
To install an AC power supply, do the following:
1.If necessary, remove the power supply locking screw located in the center rear of the device (illustrated below).
2.If the empty power supply bay has a cover plate, press inward on the two latches near the left and right edges of the cover plate to unlock the plate (illustrated below), then remove the plate.
Power supply locking screw
Latches
3.Remove the new power supply from its packaging.
3 - 6 | © 2007 Foundry Networks, Inc. | September 2007 |