Foundry Networks FGS648P-POE, FGS624P Powering On the System, Install top screws Install device

Page 36

FastIron GS Compact Layer 2 Switch Hardware Installation Guide

Figure 3.4 Installing the Brackets

Power

PS1

 

PS2

25C

 

26C

 

 

Console

1

 

2

 

Lnk/

 

 

Act

FDX

 

Lnk/

25F

Act

FDX

 

Lnk

26F

 

Act

 

13 14

2.If there are no studs on which to mount the device, install 1/2" thick plywood to the wallboard or mounting surface.

3.Mount the device on the wall or plywood as illustrated in Figure 3.5.

NOTE: The kit does not come with screws for mounting the device to the wall. Use #10 screws to ensure proper fit with the wall mount brackets.

NOTE: First install the top two screws on the wall, then slide the brackets onto the screws using the keyholes located at the top of the brackets. After mounting the device, affix the bottom two screws.

Figure 3.5 Mounting the Foundry device

1. Install top screws

2. Install device

3. Install bottom screws

4.Proceed to “Powering On the System” .

Powering On the System

Note the following before powering on the system:

The socket should be installed near the equipment and should be easily accessible.

If the outlet is not rated 115/120V, stop and get the appropriate cable for the outlet.

If your installation requires a different power cord than that supplied with the device, make sure you obtain a power cord displaying the mark of the safety agency that defines the regulations for power cords in your country. The mark is your assurance that the power cord can be used safely with the device.

3 - 14

© 2007 Foundry Networks, Inc.

September 2007

Image 36
Contents FGS Release Page Contents Hecking C Onnectivity Hardware Specifications Egulatory S Tatements Chapter About This Guide IntroductionWhat’s Included in This Edition? AudienceHow to Get Help Warranty CoverageRelated Publications Chapter Product Overview Product OverviewSoftware Features Hardware FeaturesFGS624P and FGS624P-POE FGS624XGP and FGS624XGP-POE FGS648P and FGS648P-POEControl Features Shows the FGS648P and FGS648P-POESerial Management Interface Console Port Optional 2-port 10-GbE Module port 49Reset Button Network InterfacesNetwork Interfaces Show Media Description 10/100/1000 Mbps Ports Port 10-GbE ModulePort CX4 Module Release Port 10-GbE Hybrid Interface Module Release10GbE XFP Transceiver FGS624XGP Models Only 10GbE XG and CX4 Module CX4 10Gbps XFP TransceiverLEDs for Network Interfaces and Power Supplies LEDsPosition State Meaning 10/100/1000 Copper Port LEDs 100/1000 Fiber Port LEDsPower Supply LEDs Position State MeaningGbps Port LEDs POE Port LEDsPower Supplies Fiber Optic ModulesPosition State Meaning Stacking LEDs Power Specifications for POE Cooling System and FansSeptember Chapter Installing the FastIron GS Chassis Package ContentsUnpacking a System General RequirementsSummary of Installation Tasks Summary of Installation Tasks Where to Find More InformationInstallation Precautions General PrecautionsLifting Precautions Summary of Installation TasksPower Supply Precautions Preparing the Installation Site Installing an Additional Power SupplyCabling Infrastructure Installation Location Installing an AC Power Supply Power supply locking screw LatchesRetaining Bale AC Power Cord Installing a DC Power Supply Ground screw Negative terminal screw Ground Installing the Device Desktop InstallationRack Mount Installation Attaching the Short Mounting Brackets Wall Mount Installation Installing the Brackets and Mounting the DevicePowering On the System Install top screws Install devicePowering Off the System Verifying Proper OperationObserving the Power Status LEDs LEDs for PowerAttaching a PC or Terminal FastIron FastIron-PREM DB-9 to DB-9 Chapter Connecting Network Devices Checking Connectivity Assigning Permanent PasswordsRecovering from a Lost Password Configuring IP Addresses Devices Running Layer 2 SoftwareConnecting Network Devices Cable SpecificationsConnecting to Ethernet or Fast Ethernet Hubs Connecting to Workstations, Servers, or Routers Connecting a Network Device to a Fiber PortInstalling a Fiber Optic Module Automatic MDI/MDIX DetectionTesting Connectivity Cleaning the Fiber-Optic ConnectorsPinging an IP Address Cabling a Fiber Optic ModuleObserving LEDs Network Connection-Related LED StatesDesired Meaning Abnormal Meaning/Action State Troubleshooting Network Connections Using Virtual Cable Testing to Diagnose a CableConfiguration Notes Command SyntaxViewing the Results of the Cable Analysis This LineCable Statistics Displays September Managing Temperature Settings Using the Temperature SensorDisplaying the Temperature Chapter Managing the FastIron GS ChassisDisplaying Temperature Messages Changing the Temperature Warning LevelChanging the Chassis Temperature Polling Interval Displaying Management Module CPU UsageRemoving MAC Address Entries September Chapter Hardware Specifications Chassis SpecificationsPower Supply Specifications Chassis Specifications Physical Dimensions and WeightEnvironmental Considerations Storage EnvironmentCooling Regulatory ComplianceChassis Regulatory Compliance Description Certifications Power Source Interruptions Mean Time Between FailurePower Draw Specifications Power Supply Draw Specifications Model Typical MaximumPinouts and Signalling Serial Console Port PinoutsLists the pin assignment and signalling for 10/100/100 ports 10/100 and Gigabit Port PinoutsLC connector 62.5/125 200 For SFP module Power Supply Specifications Power CordsWarranty LC connector 1530.33 Up to For XFP module 1561.42 nm 80 kmKey features Power Supply Consumption 10 Maximum Power Supply Consumption for FGS Models FGS624FGS648 Input Connector and Plug 11 Input Connector for Power SuppliesPower Supply Input Connector Properties Safety Warnings 13 Safety Warning Labels on Power SuppliesElectrical Specifications Output SpecificationsHardware Maintenance Schedule Replacing a Power SupplyChapter Maintaining the FastIron GS Hardware Installation Precautions and Warnings Determining Which Power Supply FailedAC Power Supplies Removing an AC Power Supply Locking screwInstalling an AC Power Supply DC Power Supplies Removing a DC Power Supply Shows a front view of the DC power supplyInstalling a DC Power Supply Ground Installing or Replacing a 2-port 10-GbE Module Installing a 2-port 10-GbE ModuleRemoving a 2-port 10-GbE Module Installing or Replacing a POE Daughter Card Installing a 2-port 10-GbE ModuleDisassembling the Chassis Removing the Screws for the Top CoverInstalling a POE Daughter Card Removing the Top CoverPOE Daughter Card Re-assembling the Chassis POE Daughter CardsReplacing a Fiber Optic Module Removing a Fiber Optic ModuleCleaning the Fiber-Optic Connectors Installing a New Fiber Optic ModuleCabling a Fiber Optic Module Digital Optical Monitoring Status Value DescriptionCLI Commands No optical-monitor alarm intervalSupported Media Show optic port/slotnumberAppendix a Regulatory Statements Industry Canada StatementEurope and Australia JapanEnglish Translation of above statement Appendix B Foundry Networks, Inc Page Foundry Networks, Inc Page September Page September