Foundry Networks FGS624XGP-POE, FGS648P-POE, FGS624P-POE manual Installing a DC Power Supply

Page 75

Maintaining the FastIron GS Hardware

Installing a DC Power Supply

1.If necessary, before installing a power supply, remove the power supply locking screw located in the center rear of the device (illustrated below).

Power Supply

Locking Screw

Latches

2.If the empty power supply bay has a cover plate, unlock it by pressing inward on the two latches near the left and right edges of the cover plate (illustrated above), then remove the plate.

3.Remove the new power supply from its packaging.

4.Prepare the positive, negative, and ground wires by stripping about 1/4" of insulation off the end of each one. (Use 10 AWG wire.)

5.Loosen the three screws used to hold the wires in the connectors. These are located under the following markings and shown in the illustration below:

Ground screw

 

Negative terminal screw

Handle

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Positive terminal screw

September 2007

© 2007 Foundry Networks, Inc.

7 - 7

Image 75
Contents FGS Release Page Contents Hecking C Onnectivity Hardware Specifications Egulatory S Tatements Audience Chapter About This GuideIntroduction What’s Included in This Edition?How to Get Help Warranty CoverageRelated Publications Product Overview Chapter Product OverviewSoftware Features Hardware FeaturesFGS624P and FGS624P-POE FGS648P and FGS648P-POE FGS624XGP and FGS624XGP-POEShows the FGS648P and FGS648P-POE Control FeaturesOptional 2-port 10-GbE Module port 49 Serial Management Interface Console PortReset Button Network InterfacesNetwork Interfaces Show Media Description Port 10-GbE Module 10/100/1000 Mbps PortsPort CX4 Module Release Port 10-GbE Hybrid Interface Module Release10GbE XFP Transceiver FGS624XGP Models Only CX4 10Gbps XFP Transceiver 10GbE XG and CX4 Module100/1000 Fiber Port LEDs LEDs for Network Interfaces and Power SuppliesLEDs Position State Meaning 10/100/1000 Copper Port LEDsPOE Port LEDs Power Supply LEDsPosition State Meaning Gbps Port LEDsPower Supplies Fiber Optic ModulesPosition State Meaning Stacking LEDs Cooling System and Fans Power Specifications for POESeptember General Requirements Chapter Installing the FastIron GS ChassisPackage Contents Unpacking a SystemSummary of Installation Tasks Where to Find More Information Summary of Installation TasksSummary of Installation Tasks Installation PrecautionsGeneral Precautions Lifting PrecautionsPower Supply Precautions Preparing the Installation Site Installing an Additional Power SupplyCabling Infrastructure Installation Location Power supply locking screw Latches Installing an AC Power SupplyRetaining Bale AC Power Cord Installing a DC Power Supply Ground screw Negative terminal screw Ground Installing the Device Desktop InstallationRack Mount Installation Attaching the Short Mounting Brackets Installing the Brackets and Mounting the Device Wall Mount InstallationInstall top screws Install device Powering On the SystemVerifying Proper Operation Powering Off the SystemObserving the Power Status LEDs LEDs for PowerAttaching a PC or Terminal FastIron FastIron-PREM DB-9 to DB-9 Assigning Permanent Passwords Chapter Connecting Network Devices Checking ConnectivityRecovering from a Lost Password Devices Running Layer 2 Software Configuring IP AddressesConnecting Network Devices Cable SpecificationsConnecting to Ethernet or Fast Ethernet Hubs Automatic MDI/MDIX Detection Connecting to Workstations, Servers, or RoutersConnecting a Network Device to a Fiber Port Installing a Fiber Optic ModuleCabling a Fiber Optic Module Testing ConnectivityCleaning the Fiber-Optic Connectors Pinging an IP AddressObserving LEDs Network Connection-Related LED StatesDesired Meaning Abnormal Meaning/Action State Command Syntax Troubleshooting Network ConnectionsUsing Virtual Cable Testing to Diagnose a Cable Configuration NotesViewing the Results of the Cable Analysis This LineCable Statistics Displays September Chapter Managing the FastIron GS Chassis Managing Temperature SettingsUsing the Temperature Sensor Displaying the TemperatureChanging the Temperature Warning Level Displaying Temperature MessagesChanging the Chassis Temperature Polling Interval Displaying Management Module CPU UsageRemoving MAC Address Entries September Chapter Hardware Specifications Chassis SpecificationsPower Supply Specifications Storage Environment Chassis SpecificationsPhysical Dimensions and Weight Environmental ConsiderationsCooling Regulatory ComplianceChassis Regulatory Compliance Description Certifications Mean Time Between Failure Power Source InterruptionsPower Supply Draw Specifications Model Typical Maximum Power Draw SpecificationsSerial Console Port Pinouts Pinouts and Signalling10/100 and Gigabit Port Pinouts Lists the pin assignment and signalling for 10/100/100 portsLC connector 62.5/125 200 For SFP module LC connector 1530.33 Up to For XFP module 1561.42 nm 80 km Power Supply SpecificationsPower Cords WarrantyKey features Power Supply Consumption 10 Maximum Power Supply Consumption for FGS Models FGS624FGS648 Input Connector and Plug 11 Input Connector for Power SuppliesPower Supply Input Connector Properties 13 Safety Warning Labels on Power Supplies Safety WarningsOutput Specifications Electrical SpecificationsHardware Maintenance Schedule Replacing a Power SupplyChapter Maintaining the FastIron GS Hardware Installation Precautions and Warnings Determining Which Power Supply FailedAC Power Supplies Locking screw Removing an AC Power SupplyInstalling an AC Power Supply DC Power Supplies Shows a front view of the DC power supply Removing a DC Power SupplyInstalling a DC Power Supply Ground Installing or Replacing a 2-port 10-GbE Module Installing a 2-port 10-GbE ModuleRemoving a 2-port 10-GbE Module Installing a 2-port 10-GbE Module Installing or Replacing a POE Daughter CardRemoving the Screws for the Top Cover Disassembling the ChassisRemoving the Top Cover Installing a POE Daughter CardPOE Daughter Card POE Daughter Cards Re-assembling the ChassisRemoving a Fiber Optic Module Replacing a Fiber Optic ModuleCleaning the Fiber-Optic Connectors Installing a New Fiber Optic ModuleCabling a Fiber Optic Module Status Value Description Digital Optical MonitoringShow optic port/slotnumber CLI CommandsNo optical-monitor alarm interval Supported MediaJapan Appendix a Regulatory StatementsIndustry Canada Statement Europe and AustraliaEnglish Translation of above statement Appendix B Foundry Networks, Inc Page Foundry Networks, Inc Page September Page September