Foundry Networks FGS648P-POE, FGS624P Observing LEDs, Network Connection-Related LED States

Page 47

Connecting Network Devices and Checking Connectivity

Observing LEDs

After you install the network cables, you can observe certain LEDs to determine if the network connections are functioning properly. Table 4.2 outlines the LEDs related to the network connections, the desired state of each LED, possible abnormal states of each LED, and what to do if an LED indicates an abnormal state.

Table 4.2: Network Connection-Related LED States

LED

Desired

Meaning

Abnormal

Meaning/Action

 

State

 

State

 

 

 

 

 

 

 

Link (Lnk)

On

A link is established

Off

A link is not established with the remote port.

 

(Green)

with the remote port.

 

You can do the following:

 

 

 

 

Verify that the connection to the other

 

 

 

 

 

network device has been properly made.

 

 

 

 

 

Also, make certain that the other network

 

 

 

 

 

device is powered on and operating

 

 

 

 

 

correctly.

 

 

 

 

Verify that the transmit port on the

 

 

 

 

 

Foundry device is connected to the

 

 

 

 

 

receive port on the other network device,

 

 

 

 

 

and that the receive port on the Foundry

 

 

 

 

 

device is connected to the transmit port

 

 

 

 

 

on the other network device. If you are not

 

 

 

 

 

certain, remove the two cable connectors

 

 

 

 

 

from the port connector and reinsert them

 

 

 

 

 

in the port connector, reversing their

 

 

 

 

 

order.

 

 

 

 

Dust may have accumulated in the cable

 

 

 

 

 

connector or port connector. For

 

 

 

 

 

information about cleaning the

 

 

 

 

 

connectors, see “Cleaning the Fiber-Optic

 

 

 

 

 

Connectors” on page 4-6.

 

 

 

 

If the other actions don’t resolve the

 

 

 

 

 

problem, try using a different port or a

 

 

 

 

 

different cable.

 

 

 

 

 

Active (Act)

On or

The port is

Off for an

The port is not transmitting or receiving user

 

blinking

transmitting and

extended

packets. You can do the following:

 

(Yellow)

receiving user

period.

Check the Link LED to make sure the link

 

 

packets.

 

 

 

 

 

is still established with the remote port. If

 

 

 

 

 

 

 

 

 

 

not, take the actions described in the

 

 

 

 

 

Meaning/Action column for the Link LED.

 

 

 

 

Verify that the port has not been disabled

 

 

 

 

 

through a configuration change. You can

 

 

 

 

 

use the CLI. If you have configured an IP

 

 

 

 

 

address on the device, you also can use

 

 

 

 

 

the Web management interface or

 

 

 

 

 

IronView Network Manager.

 

 

 

 

 

 

If a problem persists after taking these actions, contact Foundry’s technical support.

September 2007

© 2007 Foundry Networks, Inc.

4 - 7

Image 47
Contents FGS Release Page Contents Hecking C Onnectivity Hardware Specifications Egulatory S Tatements Audience Chapter About This GuideIntroduction What’s Included in This Edition?Related Publications How to Get HelpWarranty Coverage Product Overview Chapter Product OverviewFGS624P and FGS624P-POE Software FeaturesHardware Features FGS648P and FGS648P-POE FGS624XGP and FGS624XGP-POEShows the FGS648P and FGS648P-POE Control FeaturesOptional 2-port 10-GbE Module port 49 Serial Management Interface Console PortNetwork Interfaces Show Media Description Reset ButtonNetwork Interfaces Port 10-GbE Module 10/100/1000 Mbps Ports10GbE XFP Transceiver FGS624XGP Models Only Port CX4 Module ReleasePort 10-GbE Hybrid Interface Module Release CX4 10Gbps XFP Transceiver 10GbE XG and CX4 Module100/1000 Fiber Port LEDs LEDs for Network Interfaces and Power SuppliesLEDs Position State Meaning 10/100/1000 Copper Port LEDsPOE Port LEDs Power Supply LEDsPosition State Meaning Gbps Port LEDsPosition State Meaning Stacking LEDs Power SuppliesFiber Optic Modules Cooling System and Fans Power Specifications for POESeptember General Requirements Chapter Installing the FastIron GS ChassisPackage Contents Unpacking a SystemSummary of Installation Tasks Where to Find More Information Summary of Installation TasksSummary of Installation Tasks Installation PrecautionsGeneral Precautions Lifting PrecautionsPower Supply Precautions Cabling Infrastructure Installation Location Preparing the Installation SiteInstalling an Additional Power Supply Power supply locking screw Latches Installing an AC Power SupplyRetaining Bale AC Power Cord Installing a DC Power Supply Ground screw Negative terminal screw Ground Rack Mount Installation Installing the DeviceDesktop Installation Attaching the Short Mounting Brackets Installing the Brackets and Mounting the Device Wall Mount InstallationInstall top screws Install device Powering On the SystemVerifying Proper Operation Powering Off the SystemAttaching a PC or Terminal Observing the Power Status LEDsLEDs for Power FastIron FastIron-PREM DB-9 to DB-9 Assigning Permanent Passwords Chapter Connecting Network Devices Checking ConnectivityRecovering from a Lost Password Devices Running Layer 2 Software Configuring IP AddressesConnecting to Ethernet or Fast Ethernet Hubs Connecting Network DevicesCable Specifications Automatic MDI/MDIX Detection Connecting to Workstations, Servers, or RoutersConnecting a Network Device to a Fiber Port Installing a Fiber Optic ModuleCabling a Fiber Optic Module Testing ConnectivityCleaning the Fiber-Optic Connectors Pinging an IP AddressDesired Meaning Abnormal Meaning/Action State Observing LEDsNetwork Connection-Related LED States Command Syntax Troubleshooting Network ConnectionsUsing Virtual Cable Testing to Diagnose a Cable Configuration NotesCable Statistics Displays Viewing the Results of the Cable AnalysisThis Line September Chapter Managing the FastIron GS Chassis Managing Temperature SettingsUsing the Temperature Sensor Displaying the TemperatureChanging the Temperature Warning Level Displaying Temperature MessagesRemoving MAC Address Entries Changing the Chassis Temperature Polling IntervalDisplaying Management Module CPU Usage September Power Supply Specifications Chapter Hardware SpecificationsChassis Specifications Storage Environment Chassis SpecificationsPhysical Dimensions and Weight Environmental ConsiderationsChassis Regulatory Compliance Description Certifications CoolingRegulatory Compliance Mean Time Between Failure Power Source InterruptionsPower Supply Draw Specifications Model Typical Maximum Power Draw SpecificationsSerial Console Port Pinouts Pinouts and Signalling10/100 and Gigabit Port Pinouts Lists the pin assignment and signalling for 10/100/100 portsLC connector 62.5/125 200 For SFP module LC connector 1530.33 Up to For XFP module 1561.42 nm 80 km Power Supply SpecificationsPower Cords WarrantyKey features FGS648 Power Supply Consumption10 Maximum Power Supply Consumption for FGS Models FGS624 Power Supply Input Connector Properties Input Connector and Plug11 Input Connector for Power Supplies 13 Safety Warning Labels on Power Supplies Safety WarningsOutput Specifications Electrical SpecificationsChapter Maintaining the FastIron GS Hardware Hardware Maintenance ScheduleReplacing a Power Supply AC Power Supplies Installation Precautions and WarningsDetermining Which Power Supply Failed Locking screw Removing an AC Power SupplyInstalling an AC Power Supply DC Power Supplies Shows a front view of the DC power supply Removing a DC Power SupplyInstalling a DC Power Supply Ground Removing a 2-port 10-GbE Module Installing or Replacing a 2-port 10-GbE ModuleInstalling a 2-port 10-GbE Module Installing a 2-port 10-GbE Module Installing or Replacing a POE Daughter CardRemoving the Screws for the Top Cover Disassembling the ChassisRemoving the Top Cover Installing a POE Daughter CardPOE Daughter Card POE Daughter Cards Re-assembling the ChassisRemoving a Fiber Optic Module Replacing a Fiber Optic ModuleCabling a Fiber Optic Module Cleaning the Fiber-Optic ConnectorsInstalling a New Fiber Optic Module Status Value Description Digital Optical MonitoringShow optic port/slotnumber CLI CommandsNo optical-monitor alarm interval Supported MediaJapan Appendix a Regulatory StatementsIndustry Canada Statement Europe and AustraliaEnglish Translation of above statement Appendix B Foundry Networks, Inc Page Foundry Networks, Inc Page September Page September