Z Microsystems ZX Station manual Y2K Compliance

Page 31

Appendix

Y2K COMPLIANCE

Z Microsystems has achieved full Y2K Compliance.

In late 1997, the company’s senior management assigned a Y2K Project Team that consists of a cross-functional representation from information technology, procurement, manufacturing, test and development, finance, general affairs, engineering, marketing and facilities organizations to address the Year 2000 issues.

The Assessment/Rectification Phase of the Year 2000 efforts and full compliance for all mission critical internal systems were accomplished as scheduled by the end of Q1, 1999. Contingency development and validation of the company’s overall Year 2000 readiness will continue through 1999.

The following strategically important categories have been assessed for Year

2000 readiness:

Suppliers and Service Providers Readiness.

All major strategic suppliers are assessed to be Year 2000 compliant. Most of the company’s service providers’ compliance efforts will continue through 1999. Major concerns and efforts will be focused on the company’s shipping compa- nies in 1999.

Z Microsystems Internal Systems

All mission critical internal systems are determined to be fully Year 2000 Compliant. A few minor Year 2000 related issues need to be addressed in 1999.

Z Microsystems Products

All Z Microsystems products are in full compliance.

The company’s MIS has taken the lead and worked with the Finance Depart- ment to develop comprehensive Year 2000 Contingency Plans for the company’s mission critical application systems to assure the continuity of daily business.

31

Document# 27-0007UM Issued 11/00 Rev. 1.0

Image 31
Contents ZX Station FCC Information RegulatoryContents Starting Point Shipment ContentsFIELD-READY Product DescriptionStarting Point Tools Required PrecautionsSlide Removal Install SlidesInstall the Slides in Cabinet Frame Install the ZX Station in Cabinet Frame Install ZX StationInstallation Test Securing ZX Station in Cabinet Frame Final AdjustmentsInstalling Cables CD-ROM Powering UPOperation Controls and DisplaysTranzpak Front Panel Disk Module Handle Function SwitchFront Panel Functioning Installing Disk Module Powering UP the Hard Disk Setting the Scsi ID Function Switch Versions Function Switch Electrical DescriptionLocking the Disk Module and Hard Disk Operation Operating the Disk Module Powering Down the Hard DiskRemoving the Disk Module Carrying the Disk Module Installing Your OWN Hard Disk DriveOpening the ZX Station Internal AccessClosing the ZX Station Clean Front Panel MaintenanceFront Panel TroubleshootingTBD SpecificationsEMI Appendix WarrantyDept. at Z Microsystems 858 Handling Classified material Y2K Compliance Further Help SupportProviding Feedback Replacing PartsMicrosystems, Inc