Kathrein cap910 Safety Instructions Important Notes, Essential information, Adhesive sealant

Page 7

SAFETY INSTRUCTIONS - IMPORTANT NOTES

Safety during installation work

When carrying out installation work in locations where there is a risk of falling, take appropriate safety precautions, e.g. use of a working platform. Make sure that the vehicle roof is sufficiently strong and stable to carry out the installation work (risk of damage or collapsing of roof).

In case of doubt, contact a qualified specialist dealer or the manufacturer of your vehicle to find an appropriate installation location.

Make sure that:

-The turntable and connected units are disconnected from the power supply

-The person carrying out the installation or repair does not suffer from vertigo and can move around safely on the roof of the caravan or motor home

-The person carrying out the installation or repair is wearing sturdy and non-slip shoes

-The person carrying out the installation or repair has a secure position to stand and hold on while working

-The roof and the climbing equipment used (e.g. ladder) are dry, clean and non-slip

-The roof can withstand the weight of the person carrying out the repairs

Caution! Risk of death or injury due to falling or the roof collapsing!

-Nobody should be inside the caravan/motor home underneath the antenna during dismantling/ installation

Caution! Risk of death or injury due to possible roof collapse and falling parts!

Proper installation and safety

Essential information

A crucial safety factor is proper performance of installation and electrical connection work, and the specified alignment of the turntable in the direction of travel (park position), see also installation and connection.

Comply as precisely as possible with the installation conditions and steps described.

Modifications to the electrical installations in the vehicle should only be carried out by a specialist in vehicle electrics. Do not make any unauthorised changes to the turntable.

Adhesive sealant

The turntable is attached to the roof of the vehicle by adhesive and is secured by additional screws.

Note that the curing of the adhesive sealant is temperature-dependent. It reaches its full strength only after approximately five days.

During installation work, comply strictly with the processing and safety instructions for the adhesive sealant (Sikaflex® 291 safety data sheet and Sikaflex® 291 technical data sheet).

7

Image 7
Contents CAP Company Address and Accredited Representative GeneralProduct Package Mobiset 4 CAP 910 Components / Scope of DeliveryContents Installation Manual Contents Operating Manual Proper USE USE for the Intended Purpose Proper USEEssential information Safety Instructions Important NotesAdhesive sealant Road Traffic Licensing Regulations StVZO Power supply, fusingChecks before commencing a journey Unpacking and Preparation Installation and ConnectionSelecting the Installation Location Required Tools and EquipmentDirection of travel Installation Steps Figure C Not included Variant with Cable Gland Underneath the Turntable Installation of TurntableFigure E1 Master coaxial cable marked red Version with External Cable Gland FIG. F Installation and Connection Selection of a Suitable Installation Location Installation of the UFS 940SWPreparations Important Instructions for Installation Rear of the receiver Front of the receiver Installation Laying Cables and Connecting the Turntable Installation and Connection Receiver. There is no restriction on Connection Example for 12 V Battery ConnectionReception Range / Footprint ESC Address of the Service CentreDismantling for Servicing DismantlingManual Lowering to Park Position Safety InstructionsManual Lowering Direction of travel Technical SpecificationsPotential hazards Sikaflex 291 Safety Data SheetMaterials/preparation and company designation Composition/data on componentsExposure limitation and personal protective equipment Measures for fire fightingMeasures if inadvertently released Handling and storageStability and reactivity Physical and chemical characteristicsTransport data Toxicology data SensitisationEcological data Disposal instructionsOther data Sikaflex-291 Ikaflex Sikaflex 291 Technical Data SheetChemical Stability CAP 910 Operating Manual CAPRemote Control Important Information for CAP 910 Before SetupFirst Installation Hdmi Video System Automatic clock change summer/winter time Local time offset UTCAll satellite positions found by a search will be deleted CAP Menu Turntable Antenna SettingsResetting the CAP System Turntable Antenna Reset Calling UP the CAP MenuTo Move the Antenna Manually Inputting the CAP GPS PositionElevation LNB TILT/SKEW Stop on SignalMove to the Azimuth Rotate the Antenna Search Speed CAP SettingsMove CAP to Park Position Elevation Border and Elevation OffsetCountdown for the Search Start Restore Factory SettingsAlignment Satellite Search Channel Selection from the Channel List Channel Satellite SELECTION/PROGRAMMING the TimerChannel Selection from the Channel List Sorted by Satellite Timer ProgrammingChange of Location Change of Location Parking the Turntable ParkSystem Protection Messages Special Messages from the TurntableSpecial Messages from the Turntable Further Messages Messages Arising from Software ProblemsTimer function is currently not yet available in CAP mode Declaration of Conformity Spent batteries are special waste Disposal Instructions