GATE OPERATOR INSTALLATION
Post Mounting Option
TIP: The operator is equipped for post mount applications and is ready for installation. You will only need to supply the posts and
1. Consult the local building codes for the depth and concrete requirements.
2.Maximum 3.00” OD pipe.
3.Provide a sufficient number of conduit pathways for all low power acces- sories such as loop detector leads, maglock,
!DO NOT run low voltage and high voltage wiring in the same conduit.
!Provide at least 12” separation between low and high voltage conduits.