Viking Access Systems H-10 manual Electrical Installation, High Voltage Supply Option

Page 20

ELECTRICAL INSTALLATION

High Voltage Supply Option

!Caution: Always turn off power breakers when working with high voltage. DO NOT connect the “Power Harness” to the Control Board until the electrical installation is complete and ready for verification.

STEP 1

At the “Power Box”:

a.Setet the “Voltage Selector” according to the supply voltage (115V or 230V).

b.Turn the “AC Power” switch ON

STEP 2

!WARNING: SINGLE PHASE AC ONLY

At the “J-Box”:

a.Connect the incoming power wires, matching the wire color codes.

b.If the supply voltage is 120VAC, connect the red wire, labeled “Outlet Power”, to the neutral (white) wires.

STEP 3

a.Turn ON the main facility breaker

b.Verify that all three (3) LEDs are illuminated at the “Power Box”.

c.Turn the “Battery Switch” ON.

At the Control Board:

d. Connect the Power Harness and verify the “POWER” LED is illuminated solid.

!TECHNICAL TIP: If the “Power” LED is flashing or any of the 3 LEDs on the “Power Box” are not illuminated, refer to the Troubleshooting pages.

1b

1a

3b

3d

2a

3c

Tips for proper ground installation:

To minimize the effects caused by lightning, follow these guidelines.

• Use a ground rod to provide a ground reference.

• Consult your city code and be aware of under-ground services in the site of the gate operator to prevent inconveniences.

• Always use a single bonding point for grounding.

• All ground wires must be as short and as thick as

possible.

 

• Prevent unnecessary turns or loops in all ground

 

wires.

 

1 8

VIKING TECHNICAL SUPPORT 1.800.908.0884

Image 20
Contents Instructions Viking H-10 Slide Gate Operator Vehicular Gate Operator Revision H10NXMN10.E December Parts Diagram DescriptionOperator References EMI Board Connector Control Board ReferencesTable of Contents Important Safety Information Important Safety InstructionsImportant Installation Instructions Maintenance UL325 Gate Operator Classifications GlossaryPhoto Beam non-contact sensor Installation Secondary Entrapment ProtectionManual Release Edge Sensor contact sensor InstallationWhen manual operation is required Audible Alarm Reset Switch Installation Manual Reset for the Audible AlarmSpecifications Single Phase 50 Hz / 60 HzAlternative Power 24VAC / VDC 60VA or Solar Locate Control ButtonsGate Operator Installation Concrete Pad OptionPost Mounting Option Operator Positioning Step High Voltage Supply Option Electrical InstallationTips for proper ground installation Low Voltage Supply Option Solar Supply OptionLimits Setup 1a 1bTo Readjust the Open Limit To Readjust the Close LimitMS1 MS2 MASTER/SLAVE SetupTwo Wire Communication Wireless Communication Options Required ADD-ON Choose option a or BObstruction Detection Sensor Initial SettingsTimer Hold Open Timer Control Board Setup Auto Open Power Failure OptionLast Open Power Failure Option Fail Safe/SecureObstruction Sensor Primary Entrapment Protection ODS Obstruction Detection SensorViking Lock Mode Viking HeaterThis page Left Blank Intentionally Accessory Connections Re-Open Photo Beam vehicular SafetyCOM + Check for proper operationOpen Only Radio Receiver TypicalOpen-Stop-Close Anti-Tailgate, Open Commands & Guard Station Open CommandsGuard Station ATG Anti-TailgateViking Loop Rack Accessory Connections Guidelines for Loop InstallationMagnetic Lock Lock Solenoid Power for the LocksMagnetic Lock, Lock Solenoid Synchronization with B-12 Barrier Arm B-12 Synchronization OptionTroubleshooting LED ReferencesTroubleshooting LCD MSG Meaning LCD Display ReferencesTroubleshooting Error Messages Solutions CheckAccess Control Connections Power ConnectionsAppendix a Relays In GeneralGeneral Technical TIP Viking usesCommon Radio Receivers Connections Appendix C Solar ApplicationsPanels Batteries & FuseViking Konnect Master/Slave Kit Secure and reliable Viking Konnect Diagnostic Tool On-site remoteViking Expansion Products OUR Continuous Commitment to Excellence Standard Features