Panasonic WV-SW598 AC power supply connector kit accessory, Network cable

Page 27

24 V AC power supply connector kit (accessory)

Recommended specification of cable (wire)

Wire size

#24

#22

#20

#18

(AWG),

(0.22 mm)

(0.33 mm)

(0.52 mm)

(0.83 mm)

stranded

 

 

 

 

wire

 

 

 

 

 

 

 

 

 

Length of

20 m

30 m

45 m

75 m

cable

{65.62 feet}

{98.43 feet}

{147.64 feet}

{246.06 feet}

 

 

 

 

 

Power supply connector housing (accessory)

Pin No. Signal

1 24 V AC LIVE (Brown)

2 24 V AC NEUTRAL (Blue)

3 Ground (Green)

4 Not use

How to assemble the 24 V AC power supply con- nector kit

Remove approx. 3 mm {1/8 inches} of the outer jacket of the cable and twist the cable core to prevent the short cir- cuit first.

Insert the tip of the cable into the point A of the contact (accessory), and hold the cable using the cable clamp.

 

 

Approx. 3 mm {1/8 inches}

Cable

 

 

 

 

Upper

A

 

Contact

side

 

 

(accessory)

Insert

 

Procure either of the following tools for clamping. Molex manual clamp tool:

57027-5000 (for UL1015), 57026-5000 (for UL1007) After clamping the contact (accessory) and the cable, insert the contact properly into the power supply connec- tor housing (accessory).

Upper side

Cable

 

Contact (accessory)

Power supply connector housing (accessory)

IMPORTANT:

Conduct the electric conduit work after processing the power supply connector and making sure that the camera is operating normally.

• Network cable

Connect a LAN cable (category 5e or better) to the net- work connector.

IMPORTANT:

Use all 4 pairs (8 pins) of the LAN cable.

The maximum cable length is 100 m {328 feet}.

Make sure that the PoE+ device in use is compliant with IEEE802.3at standard.

When connecting both of the 24 V AC power supply and the PoE+ device for power supply, 24 V AC will be used for power supply.

If a 24 V AC power supply and a PoE (or PoE+) hub or router are used at the same time, network connec- tions may not be possible. In this case, disable the PoE settings. Refer to the operating instructions of the PoE (or PoE+) hub or router in use.

When disconnecting the LAN cable once, reconnect the cable after around 2 seconds. When the cable is quickly connected, the power may not be supplied from the PoE+ device.

Output cable for the monitor used for adjustment

Connect a coaxial cable (BNC) (only for checking if images are displayed on the monitor).

This output is provided only for checking the adjustment of the angular field of view on the video monitor when installing the camera or when servicing.

IMPORTANT:

The monitor out connector for adjustment is provided only for checking the adjustment of the angular field of view on the video monitor when installing the cam- era or when servicing. It is not provided for recording/ monitoring use.

Black bands may appear at the top and bottom or right and left of the screen. (That does not affect the adjustment because the angular field of view is not changed.)

27

Image 27
Contents Cs0313-1043 PGQX1224YACan ICES-3A/NMB-3A Contents Important safety instructions Disclaimer of warranty Limitation of liabilityPreface Main functions System requirements for a PC CPUIntel CoreTM 2 Duo 2.4 GHz or faster recommended Trademarks and registered trademarks CopyrightNetwork security Precautions This product has no power switch Do not damage the power cableCorrectly perform all wiring Turn the power off when cleaning this productCode label Periodically images on the screen appear to be dis- tortedWhat to do if Warming UP-PLEASE Wait appears on the display About SD memory cardTilt angles and the zoom ratio Position refreshPrecautions for installation Take notice of humidity Check before installationPoE+ Power over Ethernet Plus Time & date settingMain body Major operating controlsOFF šON Turn off the power of the camera Initialize the cameraStep Remove the locking screw of the water-resistant cap How to insert an SD memory cardWhen inserting an SD memory card, make sure the direction Insert/remove an SD memory cardHow to remove the SD memory card Power Source IEC/EN/UL/CSA Installations/ConnectionsHow to detach the housing base When using the mount bracket custom-made InstallationInstall the mounting bracket When using the wall mount bracket WV-Q122 optionPlate spring Projection Dents Wire Detach the hooks Front/rear sunshields xing screw Connection 8P alarm cable connectorOutput cable for the monitor used for adjustment AC power supply connector kit accessoryRecommended specification of cable wire How to assemble the 24 V AC power supply con- nector kitAudio output cable External I/O cableRatings Microphone/line input cableConnection example Required cableLAN cable category 5e or better, cross LAN cable category 5e or better, straight Configuring the camera so that it can be accessed from a PC Configure the network settingsPage Troubleshooting Power cable, plug Live indicator keeps onLive indicator lights red Power cable insulation is DamagedIt is hard to see images with About the live indicatorCamera when there are Operation status Indicator statusTerminal 1, Terminal 2, and Terminal SpecificationsAlarm in 1 BLACK/WHITE IN/ Alarm in 2 Alarm OUT Alarm in 3 AUX OUT x1 eachATW1/ ATW2/ AWC LensMLD, ICMP, ARP Jpeg MjpegBB-HCA8CE Standard accessoriesOptional accessories BB-HCA8APage Page Page Page Page Page Http//panasonic.net For business users in the European UnionFor U.S. and CanadaFor Europe and other countries Panasonic Corporation