Gold's Gym GGSY69320 manual Frame Assembly, Do not tighten the Locknuts yet

Page 6

1.

Frame Assembly

Before beginning assembly, make sure you understand the information in the box on page 5.

1

105

105

53

71

Locate and open the parts bags labeled “FRAME ASSEMBLY 1” and “FRAME ASSEM- BLY 2.”

Press four 50mm Square Inner Caps (105) into the Rear Stabilizer (53) and the Long Base (120).

Attach the Rear Stabilizer (53) to the Long Base

(120)with two M8 x 70mm Carriage Bolts (131) and two M8 Nylon Locknuts (71). Do not tighten the Locknuts yet. Make sure the iron plate is on the bottom.

Insert four M10 x 65mm Carriage Bolts (110) up into the Long Base (120). Note: It may be help- ful to place tape over the heads of the Carriage Bolts to hold them in place.

2.Press two 50mm Square Inner Caps (105) into the Short Base (2).

Attach the Base Cap (24) to the Short Base (2) with two M4 x 20mm Self-tapping Screws (14) and two M4 Washers (142).

3.Insert four M10 x 65mm Carriage Bolts (110) up into the Short Base (2). Note: It may be helpful to place tape over the heads of the Carriage Bolts to hold them in place.

Attach the Short Base (2) to the Long Base (120) with two M10 x 70mm Bolts (134), two M10 Washers (91), and two M10 Nylon Locknuts (87).

Do not tighten the Locknuts yet.

 

Iron

120

105

 

131

 

 

Plate

 

 

 

 

 

 

110

 

 

 

120

 

 

 

105

 

 

110

 

 

2

 

105

 

 

 

 

 

 

2

 

 

 

 

105

 

24

 

 

 

142

 

 

 

14

 

 

3

 

 

 

 

 

91

134

 

 

120

 

 

 

87

91

 

 

 

 

 

87

 

 

2

 

 

 

 

110

 

 

110

 

 

6

Image 6
Contents QUESTIONS? Model No. GGSY69320 Serial NoCustomer HOT Line Table of Contents Important Precautions Before YOU Begin Right SideLeft Side Assembly Make Assembly Easier for YourselfFrame Assembly Do not tighten the Locknuts yetTighten the Locknut the Roller must be able To roll easily Assemble the other three Rollers 39 toNot tighten the Bolts and Locknuts yet Page Locknuts yet Arm Assembly Right VKR Arm not shownDo not fully tighten the Locknut yet Butterfly Frame must be able to pivot easily Repeat this step with the Left Butterfly ArmLocknut the Squat Knee Rest must be able to pivot easily Cable Assembly BLYThat the Cable Trap is turned to hold the Cable Place Page Do not overtighten the Locknut the Pivot Bracket must be able to pivot easily Is above the Leg Lever CablePage Make sure the Cable is under the indicat Ed Pulley Under the indicated PulleyPletely tighten the Locknut it should be tight DrawingLocate the Fly Cable 85. Attach the Cable Page Arm is shown removed for clarity Seat AssemblyLocate and open the parts bag labeled Seat Assembly Repeat this step with the other end of the Squat ArmTighten all of the M10 Nylon Locknuts 87 used in this step Page Adjustments Adjusting the Squat ARM, SEAT, or Butterfly BackrestAdjusting the Curl PAD Changing the Weight Setting Using the DIP AssistConverting the Butterfly Arms Adjusting the Squat Knee Rest Lbs Left Top Weight Resistance ChartLbs BottomTroubleshooting Tightening the CablesCable Diagrams Dip Cable Length 320 inchesLeg Lever Cable Length 92 inches Exercise Guidelines Cooling Down Staying MotivatedPart Identification CHART- Model No. GGSY69320 Page Cap Part LIST-Model No. GGSY69320 R0303AKey Qty Description Exploded DRAWING-Model No. GGSY69320Exploded DRAWING-Model GGSY69320Ordering Replacement Parts Limited WarrantyIcon Health & FITNESS, INC., 1500 S W., LOGAN, UT