51. Wrap the Squat Low Cable (72) over a 90mm | 51 |
|
|
Pulley (78). Attach the Pulley and a Cable Trap |
|
| |
|
|
| |
(68) between the second set of holes from the |
|
|
|
bottom of the indicated pair of Pulley Plates (63) |
|
|
|
with an M10 x 50mm Bolt (100) and an M10 |
|
|
|
Nylon Locknut (87). Make sure that the Cable |
|
|
|
Trap is turned to hold the Cable in the groove |
| 63 |
|
of the Pulley. |
| 100 | |
|
| ||
|
| 87 | 68 |
|
|
| |
|
| 78 |
|
|
| 72 |
|
52. Wrap the Squat Low Cable (72) under a 90mm | 52 |
|
|
Pulley (78). Attach the Pulley, a 25mm Spacer |
| 72 | |
|
| ||
(118), and another 90mm Pulley (78) to the indi- |
|
|
|
cated bracket on the Long Base (120) with an |
| 87 | 118 |
M10 x 95mm Bolt (92) and an M10 Nylon Locknut |
|
|
|
(87). Make sure the Cable is under the indicat- |
|
|
|
ed Pulley. |
| 78 |
|
|
|
| 92 |
|
|
| 120 |
53. Wrap the Squat Low Cable (72) under a 90mm | 53 |
| 72 |
Pulley (78). Attach the Pulley and another 90mm |
| ||
|
|
| |
Pulley (78) to the indicated bracket on the Short |
|
| 78 |
Base (2) with an M10 x 75mm Bolt (101) and an |
|
|
|
M10 Nylon Locknut (87). Make sure the Cable is |
| 87 |
|
under the indicated Pulley. |
|
| |
|
|
| |
|
| 2 | 101 |
|
|
| |
54. Wrap the Squat Low Cable (72) over a 90mm | 54 |
|
|
Pulley (78). Attach the Pulley to the first bracket |
|
| |
| 7 |
| |
on the left side of the Butterfly Top Frame (7) with |
|
| |
|
|
| |
an M10 x 45mm Bolt (93) and an M10 Nylon |
|
|
|
Locknut (87). |
|
|
|
|
|
| 87 |
|
| 93 | 78 |
|
| 72 | |
|
|
| |
55. Wrap the Squat Low Cable (72) over a 90mm | 55 |
|
|
Pulley (78). Attach the Pulley to the second |
|
| |
| 7 |
| |
bracket on the left side of the Butterfly Top Frame |
|
| |
|
|
| |
(7) with an M10 x 45mm Bolt (93) and an M10 |
|
|
|
Nylon Locknut (87). |
|
|
|
|
| 93 | 87 |
|
|
| |
|
|
| 78 |
|
|
| 72 |
20