FRAME ASSEMBLY
1.
Before you begin this step, make sure that you have read all of the information on page 5. This brief introduction will save you much more time than it takes
to read it!
Locate and open the parts bags labeled “FRAME ASSEMBLY BAG ONE” and
“FRAME ASSEMBLY BAG TWO.”
Press two 2” Square Outer Caps (58) onto the Weight Base (14) in the indicated locations. Press a 2” Square Inner Cap (56) into the end of the Weight Base.
Insert four 5/16” x 2 1/2” Carriage Bolts (49) up through the Press Base (13). Insert two
5/16” x 2 1/2” Carriage Bolts up through the Weight Base (14).
Attach the Press Base (13) to the Weight
Base (14) with two 5/16” x 2 3/4” Bolts (55), two 5/16” Washers (20), and two 5/16” Nylon
Locknuts (40). Do not tighten the Nylon
Locknuts yet.
2.Slide the Ab Upright (1) onto the indicated 5/16” x 2 1/2” Carriage Bolts (49) in the Weight Base (14). Hand tighten two 5/16” Nylon Locknuts (40) onto the Carriage Bolts.
Do not tighten the Nylon Locknuts yet.
Slide the Leg Press Upright (4) onto the indi-
cated 5/16” x 2 1/2” Carriage Bolts (49) in the Weight Base (14). Hand tighten two 5/16”
Nylon Locknuts (40) onto the Carriage Bolts.
Do not tighten the Nylon Locknuts yet.
3.Press a 2” Square Inner Cap (56) into each end of the Top Frame (2). Press a 2” Square Inner Cap (56) into each side of the Butterfly Frame (3). Press two 1” Inner Caps (98) into the top of the Butterfly Frame.
Attach the Butterfly Frame (3) to the Top |
|
Frame (2) with a 5/16” x 3” Bolt (92). | Be sure |
that the Bolt is on the side shown. |
|
Finish attaching the Butterfly Frame (3) to the Top Frame (2) with a 5/16” Nylon Jam Nut (91), a 5/16” x 2 3/4” Bolt (55), a 5/16” Washer (20), and a 5/16” Nylon Locknut (40).
6
1 |
|
|
58 | 58 |
|
55 |
| |
|
| |
20 | 13 |
|
|
| |
14 |
|
|
40 |
|
|
49 |
|
|
56 | 49 |
|
2 |
|
|
1 | 4 |
|
|
| |
40 |
| 40 |
|
| |
14 |
| 13 |
|
| |
49 | 49 |
|
3 |
| 56 |
|
| |
91 |
|
|
40 |
|
|
20 | 92 | 98 56 |
2 |
|
|
55 |
| 3 |
56 | 56 |
|
|
|