“ASSEMBLY INSTRUCTIONS”
Place all parts from the box in a cleared area and position them on the floor in front of you. Remove all packing materials from your area and place them back into the box. Read each step carefully before beginning.
| Detailed Lever- drawing 1 | ||
|
| Stabilizer | |
|
| Adjustment Plate | |
|
| Leveler (58) | |
| Detailed Lever- drawing 2 | ||
|
| Stabilizer | |
|
| Adjustment Plate | |
|
| Screw line | |
|
| Leveler (58) | |
STEP 1 – Leveler Assembly | LEVELING: After placing the | ||
equipment in the intended | |||
a. | Attach the Leveler x 4 (58) to the Front Stabilizer (2) and the Rear | ||
location for use, Check the | |||
| Stabilizer (3). | ||
b. | stability of the equipment. If the | ||
Be sure to tighten the Leveler (58) securely against the Stabilizers (2, 3) | equipment is not level, | ||
| until screw completely tightened as the drawing 1 shown on the top right | ||
| reviewing the following | ||
| corner. | ||
STEP 2 – Stabilizer Assembly | direction: | ||
| |||
Attach the Front Stabilizer (2) and the Rear Stabilizer (3) onto the Main | Loosen the Leveler (58) to | ||
Frame (1) and secure with the 4 x Washers (8x38x2.0t) (70), the 4 x Lock | |||
make the Adjustment Plate | |||
Washers (M8)(66) and the 4 x Hex Head Bolts (M8xp1.25x65mm) (94) with | |||
become less tight. | |||
the socket wrench(13mm) (See picture above) | |||
STEP 3 – Leveler Assembly | Adjust the Leveler (58) for | ||
Tighten one Leveler (58) under the middle of the Main Frame (1). | leveling. | ||
NOTE: It will be easier to attach the Leveler (58) under the Main Frame (1) by |
| ||
placing one Styrofoam (or any stationary object) under one side of the Main | Tighten the Adjustment Plate | ||
Frame (1). | securely against the Stabilizer | ||
|
| to lock the Leveler (58) in the | |
|
| stable position as the drawing | |
|
| 2 shown. |