INTRODUCTION IMPORTANT PRECAUTIONS
ASSEMBLY
BEFORE YOU BEGIN
ELLIPTICAL OPERATION
CONDITIONING GUIDELINES &
A S S E M B LY STEP 5 |
|
|
|
| LOWER LINK ARM |
| LOWER |
|
| HANDLEBAR | |
| TEFLON WASHERS |
| |
|
| SPACER |
|
GUIDE RAIL |
|
|
|
|
| NUT (G) |
|
|
|
| BOLT (D) |
|
|
| SPACER (F) |
LOWER LINK ARM | TEFLON WASHERS (E) |
|
A)Open HARDWARE BAG FOR STEP 5.
B)Slide SPACER (F) into LOWER HANDLEBAR.
C)Place TEFLON WASHERS (E) on either side of SPACER (F). While holding TEFLON WASHERS (E) slide LOWER LINK ARM into bottom end of LOWER HANDLEBAR.
D)Insert BOLT (D) into LOWER HANDLEBAR and secure using NUT (G).
E)Repeat on other side.
HARDWARE BAG FOR STEP 5 CONTENTS :
TROUBLESHOOTING LIMITED
MAINTENANCE WARRANTY
12
BOLT (D) 60 mm Qty: 2
TEFLON WASHER (E)
24mm Qty: 4
SPACER (F) 44 mm axis Qty: 2
NYLON NUT (G)
INSIDE DIAMETER:
8mm Qty: 2