The dryer system is divided into a number of “electrical” sections which are as follows:
1.Right Front Control Panel
The RIGHT FRONT CONTROL PANEL is located in the Right Front Control Cabinet of the dryer. This panel is the heart of the drying system, where ALL control signals interface to or from this panel. The signals that interface to this panel are too many to list here, however, they are ALL identified on TB1 of its’ schematic diagram.
2.Right Base Electrical Enclosure
The RIGHT BASE ELECTRICAL ENCLOSURE is located towards the front of the right base section. An industrial
•The MAIN ELECTRICAL POWER to the machine
•The ELECTRICAL CONNECTION for the “OPTIONAL” SPRINKLER CIRCUIT POWER
•The THERMAL/MAGNETIC OVERLOAD and REVERSING CONTACTOR for the TUMBLER MOTOR
•The THERMAL/MAGNETIC OVERLOAD and REVERSING CONTACTOR for the BLOWER MOTOR
3.Right Base Interface Junction Box
The RIGHT BASE INTERFACE JUNCTION BOX is located towards the rear of the right base section and is used as a central location to interface the base section electrical components to the TILTING tumbler section. An industrial
SOLENOID CONTROL
•Front Up / Front Down
•Rear Up / Rear Down
•Open Front Door
•Supply Air Enable
•Air Jet
LINT DRAWER / GUARD STATUS
TUMBLER TEMPERATURE and
•Front Level Switch
•Rear Level Switch
OPTIONAL SPRINKLER CONTROL SIGNALS
1 4