PowerLogicTM Series EM4000 | |
Installation Guide | 11/2013 |
|
|
Installation
This section contains the following installation topics:
•
•“Installation Procedures” on page 7
•“Connecting Pulse Inputs” on page 26
Pre-Installation
The
Receiving
The equipment required for each PowerLogic EM4000 meter installation includes:
•
•For the PowerLogic EM4033 and PowerLogic EM4080, one
•CD and meter configuration software, this installation manual and an installation record form
When you receive your order, verify that the items listed above are included with the shipment, and visually inspect them for damage. If any parts are missing or damaged, contact your Schneider Electric representative.
Pre-Installation Checklist
The installer must provide the following information, tools, and equipment before proceeding with the installation:
•certified current transformers for metering (not supplied)
•an appropriate
•current/voltage meter to test the phasing of panels
•RJ45 Ethernet patch cable
•
•small
•#2 Phillips screwdriver
•crimping tool
•18 AWG butt splice connector
•wire strippers
•four
Site Planning
1.Determine the number of PowerLogic EM4000 series meters to be installed and ensure adequate space. For clearances, see Figure 3 on page 8.
2.Determine the number of Ethernet drops required, and ensure they are installed before installing the PowerLogic EM4033 and EM4080 meters.
6 | ©2013 Schneider Electric All Rights Reserved |