PowerLogicTM Series EM4000 | |
11/2013 | Installation Guide |
|
|
3. | Determine the number and types of meters or monitors required |
| network, or |
4. | Determine the model number and correct sense voltage based on the voltage |
| label on the top right side of the unit. |
Access to Power and Lighting
The installation site must be supplied with access to the main electrical panel and any
Installation Procedures
This section provides information about activities that must be performed to install the PowerLogic EM4033 and EM4080 meters in a
1.“Mounting the PowerLogic EM4000 meter” on page 7
2.“Installing Potential Transformers for
3.“Installing the Sense Voltage and Control Voltage Cables in Wye and Delta Services” on page 11
4.“Installing the Current Transformers” on page 18
5.“Connecting the Communications” on page 25
a.“Connecting the Ethernet Cable” on page 25
b.“Connecting the Modbus RTU Communications” on page 25
6.“Manually Testing Communications” on page 26
7.“Connecting Pulse Inputs” on page 26
8.“Recording the Meter Map” on page 28
Mounting the PowerLogic EM4000 meter
Figure 3 shows the general mounting layout for metering 120V/208V wye services, and Figure 4 shows the general mounting layout for metering 347V/600V wye services.
1.Remove the front cover from the meter by removing the four screws with a #2 Phillips screwdriver. Retain the cover and screws for later re-installation.
2.Mount the PowerLogic meter on the wall and secure it by inserting a screw in each mounting keyhole and tightening the screws.
3.Mount the shorting block enclosure on the wall as shown in Figures 3 and 4. Secure it by inserting a screw in each mounting keyhole and tightening the screws.
4.Install the conduit for voltage and current connections.
In Figure 3, the meter is powered and takes its sense voltage directly from a breaker within the panel.