Schneider Electric EM4000 manual Hazard of Electric SHOCK, EXPLOSION, or ARC Flash

Page 20

PowerLogicTM Series EM4000

930-134-01-A.00

Installation Guide

11/2013

 

 

To install the control voltage cable in a 208Y/120V or 120/240V application:

HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH

Apply appropriate personal protective equipment (PPE) and follow safe electrical work practices. See NFPA 70E.

This equipment must only be installed and serviced by qualified electrical personnel.

Turn off all power supplying this equipment before working on or inside equipment.

Always use a properly rated voltage sensing device to confirm power is off.

Replace all devices, doors and covers before turning on power to this equipment.

The meters must be connected to the sense voltage and control voltage through a properly rated voltage disconnect (not shown in the wiring diagrams).

Failure to follow these instructions will result in death or serious injury.

NOTE: If the circuit breaker panel does not designate phase A, phase B and phase

C feeds, make your own designation and use it for the rest of the installation.

1.Before connecting the sense voltages, turn off the power to the circuit being connected.

2.Always use a properly rated voltage sensing device to confirm power is off.

3.Connect the sense voltages phase A, B, C, and N leads from the voltage disconnect to the meter as described in Figure 5 on page 13 and Figure 6 on page 14.

NOTE: The phase wiring sequence A, B, C between the PowerLogic EM4000 meter and the panel must match or the measurement readings will be wrong.

4.If more than one meter is being installed, repeat this procedure for each additional meter.

12

©2013 Schneider Electric All Rights Reserved

Image 20
Contents PowerLogicTM Series EM4000 Page Important Information Please noteFCC Part 15 Notice FCC Part 68 NoticeNetwork Compatibility Notice for the Internal Modem Page Table of Contents Schneider Electric All Rights Reserved System Description PowerLogic EM4000 series System SpecificationsIntroduction PowerLogic EM4000 series meter specifications PowerLogic EM4080 front panel Front Panel DisplayPowerLogic EM4033 and PowerLogic EM4080 internal view Safety Precautions Electrical Standards ComplianceInstallation Pre-InstallationPre-Installation Checklist ReceivingMounting the PowerLogic EM4000 meter Installation ProceduresAccess to Power and Lighting 11.0 27.9 cm EM4033 11/2013 Installation Guide Shorting block detail 930-134-01-A.00 Hazard of Electric SHOCK, EXPLOSION, or ARC Flash For a single-phase panel with the 120V variant of the meter Schneider Electric All Rights Reserved From Panel Schneider Electric All Rights Reserved Delta service metering PowerLogic EM4000 meter three-phase Delta service connectionInstalling the Current Transformers PowerLogic EM4033 split-core 0.333V current transformer Source Installing 5A Converters and CTs on the PowerLogic EM4080 Steps Shows a 5A CT connected to the converterPowerLogic EM4080 5A CT connection to converter PowerLogic EM4000 meter CT color pair identification Connecting the Modbus RTU Communications Connecting the CommunicationsConnecting the Ethernet Cable Start-Up Sequence Connecting Pulse InputsManually Testing Communications Display Navigation Normal ModeDiagnostics Mode Recording the Meter Map Installation Record sample shown Maintenance Fuse ReplacementEquipment servicing and access Regulatory ComplianceGraphical symbols that appear on equipment Index NumericsPowerLogicTM EM4000 Series 930-134-01-A.00 Index 11/2013 Page Schneider Electric