Regulatory Compliance

The PowerLogic EM4000 meter must be installed by a qualified electrician with knowledge of local installation regulations. Initial installation of the unit, and any subsequent modification to the unit, must be inspected by the local electrical inspection authority.

The PowerLogic EM4000 meter complies with the standards listed in Table 3.

Table 3: Regulatory Compliance

Discipline

Regulatory and industry standard

 

 

Standards

UL certified to IEC/EA/UL/CSA 61010-1 2nd Edition

 

CSA-C22.2 No. 61010-1-04

 

 

Emissions (EMC)

FCC Part 15 Class B, ICES-003 EN55022, IEC 6100-4-5

 

 

Surge power/telephone lines

ANSI/TIA968-A: 2002

 

 

Equipment servicing and access

The information in this section must be considered as a mandatory requirement, and must be strictly adhered to when installing and operating PowerLogic EM4033 and EM4080 meters.

Access to equipment

The equipment must be accessible to authorized personnel only. Equipment must be installed in areas where access can be restricted.

Servicing the equipment

No preventive maintenance is required on any of the equipment. Visually inspect the equipment yearly and ensure it is free of dust or other particles. If necessary, wipe with a clean cloth.

Component servicing

Individual components are not user-serviceable, and must be returned to Schneider Electric for repair. If an equipment fault occurs, do not attempt to repair the faulty component.

All maintenance activities should be performed by qualified personnel only. Do not perform any operating or maintenance procedures that are not described in the product documentation provided by Schneider Electric.

Graphical symbols

Table 4 shows the graphical symbols that appear on the equipment.

©2013 Schneider Electric All Rights Reserved

31

Image 39
Contents PowerLogicTM Series EM4000 Page Please note Important InformationFCC Part 68 Notice FCC Part 15 NoticeNetwork Compatibility Notice for the Internal Modem Page Table of Contents Schneider Electric All Rights Reserved PowerLogic EM4000 series System Specifications IntroductionSystem Description PowerLogic EM4000 series meter specifications Front Panel Display PowerLogic EM4080 front panelPowerLogic EM4033 and PowerLogic EM4080 internal view Electrical Standards Compliance Safety PrecautionsReceiving InstallationPre-Installation Pre-Installation ChecklistInstallation Procedures Access to Power and LightingMounting the PowerLogic EM4000 meter 11.0 27.9 cm EM4033 11/2013 Installation Guide Shorting block detail 930-134-01-A.00 Hazard of Electric SHOCK, EXPLOSION, or ARC Flash For a single-phase panel with the 120V variant of the meter Schneider Electric All Rights Reserved From Panel Schneider Electric All Rights Reserved PowerLogic EM4000 meter three-phase Delta service connection Delta service meteringInstalling the Current Transformers PowerLogic EM4033 split-core 0.333V current transformer Source Installing 5A Converters and CTs on the PowerLogic EM4080 Shows a 5A CT connected to the converter StepsPowerLogic EM4080 5A CT connection to converter PowerLogic EM4000 meter CT color pair identification Connecting the Communications Connecting the Ethernet CableConnecting the Modbus RTU Communications Connecting Pulse Inputs Manually Testing CommunicationsStart-Up Sequence Normal Mode Diagnostics ModeDisplay Navigation Recording the Meter Map Installation Record sample shown Fuse Replacement MaintenanceRegulatory Compliance Equipment servicing and accessGraphical symbols that appear on equipment Numerics IndexPowerLogicTM EM4000 Series 930-134-01-A.00 Index 11/2013 Page Schneider Electric