PowerLogicTM Series EM4000 |
|
Installation Guide | 11/2013 |
|
|
•Default gateway
•PPP user name
•Phone number
•AT command string
•Alternate phone number
•Unit serial number
•Firmware build number
•Ethernet port MAC address
•Firmware revision
•Potential transformer ratio
Recording the Meter Map
The final step in the installation process is to complete the Installation Record, and record the mapping of the meters to the wired points. A copy of Figure 14, which is organized to resemble a breaker panel, is provided with each PowerLogic EM4000 meter, and is to be completed and delivered to your system administrator.
28 | ©2013 Schneider Electric All Rights Reserved |