Installation
Installation
Installation of the Series 4030 Analyzer includes:
1.Unpacking
2.Mounting
3.Gas connections
4.Electrical connections
5.Testing the system.
3.1Unpacking the Analyzer
Although the Analyzer is shipped with all the materials you need to install and prepare the system for operation. Carefully unpack the Analyzer and inspect it for damage. Immediately report any damage or shortages to the shipping agent.
3.2 Mounting the Analyzer
The Series 4030 and the Sample Selector Unit are
Sufficient space must be provided around the analyzers to accommodate the necessary electrical conduit and plumbing connections. The front panel must be allowed to be pulled out for possible service access to all components of the enclosure. Refer to the system/analyzer outline drawings for dimensions.
Note: To completely slide the Model 4030 Analyzer out of the enclosure, pull Analyzer out until it stops, and then push down on the release levers found almost at the end of the sliders, both sides at the same time.
Teledyne Analytical Instruments | 15 |