Unit Dimensions
Rigging
Refer to Figure 8 and Table 1 for typical unit operating weights riffing before proceeding.
1.Remove the shipping crate from around the unit. Do not remove the crating from the top of the unit.
2.Rig the unit as shown in Figure 8. Attach adequate strength lifting slings to all four lifting brackets in the unit base rail. Do not use cables, chains, or slings except as shown.
3.Install a lifting bar, as shown in Figure 8, to protect the unit and to facilitate a uniform lift. The minimum distance between the lifting hook and the top of the unit should be 7 feet.
4.
5.Lift the unit and position it into place.
6.Downflow units; align the base rail of the unit with the curb rail while lowering the unit onto the curb. Make sure that the gasket on the curb is not damaged while positioning the unit.
20 | Packaged Heat Pump • |