Sterling SSE-5 BL operating instructions Maintenance intervals, Servicing the conveyor

Page 24

 

SSE 5 BL

5.1. Maintenance intervals

Daily:

Check warning signs on equipment for good legibility and completeness

 

Clean the filter: Use compressed air to blow through the filter (according

 

to the accumulation of dust)

Monthly:

Check function of the device plug

Every 6 months:

Check all electrical and mechanical connections for tight fit

 

Replace the filter (according to the accumulation of dust)

Annually:

Replace outlet valve sealing.

 

Adjust valve switch

FThe given maintenance intervals are average values.

Check whether in your individual case the maintenance intervals must be shortened.

5.2. Servicing the conveyor

￿Disconnect the unit from mains supply by the device plug.

Depressurize all system sections of the equipment

Disassembly the unit.

Maintenance 10

Image 24
Contents Operating Instructions Single Conveyor Unit SSE-5 BL SSE 5 BL SSE 5 BL Parts and Service Department Table of contents Technical data Spare parts list SSE-2 General instructions SSE 5 BL Explanations and information Legal basisFields of applications Safety instructions For your safety GeneralAssembly Maintenance OperationFor the operating safety of the equipment Putting into operation Checking the pipe system Adjusting the suction pipes If the conditions points 3 + 4 are metSetting the controller Switching off the unit Initial conveying operationsError and error correction When the malfunction has been corrected press the key Maintenance SSE 5 BL Maintenance intervals Servicing the conveyorObserve the direction of installation G Changing the sealing ring of the outlet flapAdjusting the flap switch Outlet flapCleaning the unit Order numberFilter cloth Wire cloth Functional description General Controller ControllerSSE 5 BL Transport, Assembly and Storage Assembly Transport and PackingStorage Assembly instructions CSE 5 BL Assembly Mounting on the processing machine Mounting onto a machine hopperMounting onto mixing hoppers with lateral inlet Mounting onto dosing station DTMaterial feed Mounting the suction pipe MVPipework Electrical connectionInstallation of the flap switch signal line Installation of the signal line of the SKW optionalInstallation of the alarm indicating device optional Installing the accessories Compressed-air supplyTechnical data SSE 5/BL Dimension Sheet Spare parts list SSE-f/BL, 230 V, 50 Hz SSE-5/BL, 230 V, 50 Hz Pos Order no Designation Wear CodeAccessories Accessories Electrical manual SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL