SSE 5 BL
5.2.1. Changing the sealing ring of the outlet flap
Remove the connecting plug “flap switch” (A)
Remove the tension ring (B) and the sealing ring (C).
Remove the upper part of the hopper loader (D) from the lower part (E).
Draw the old sealing ring (F) off the nozzle of the material outlet.
Install the new sealing ring (F)
FObserve the direction of installation (G).
Install the upper part of the hopper loader (D) on the lower part (E). Install the sealing ring (C) and the tension ring (B) on the hopper loader.
Connect the connecting plug “flap switch” (A) to the connection housing of the hopper. Install the unit.
&Order number sealing ring “material outlet”: ID 23098
Figure 0: Installation sealing ring
Maintenance 11