|
|
|
| SSE 5 BL |
Table of contents |
|
| ||
1. | 1. General instructions | |||
| 1.1. Warnings and symbols | |||
| 1.2. Explanations and information | |||
| 1.3. Legal basis | |||
| 1.4. Fields of applications | |||
| 1.5. Notes on usage | |||
2. | Safety instructions | |||
| 2.1. For your safety | |||
| 2.1.1. | General | ||
| 2.1.2. | Assembly | ||
| 2.1.3. | Operation | ||
| 2.1.4. | Maintenance | ||
| 2.2. For the operating safety of the equipment | |||
3. | Putting into operation | |||
| 3.1. Checking the pipe system | |||
| 3.2. Adjusting the suction pipes | |||
| 3.3. Setting the controller | |||
| 3.4. Initial conveying operations | |||
| 3.5. Switching off the unit | |||
4. Error and error correction | 6 | |||
5. | Maintenance | 8 | ||
| 5.1. Maintenance intervals | 10 | ||
| 5.2. Servicing the conveyor | 10 | ||
| 5.2.1. | Changing the sealing ring of the outlet flap | ............................................ 11 | |
| 5.2.2. | Adjusting the flap switch | 12 | |
| 5.2.3. | Cleaning the unit | 13 | |
| 5.3. Replacing carbon brushes at turbine | Error! Bookmark not defined. | ||
6. | Functional description | 15 | ||
| 6.1. General | ............................................................................................................... | 16 | |
| 6.2. Controller | 17 | ||
7. Transport, Assembly and Storage | 19 | |||
| 7.1. Transport and Packing | 20 | ||
| 7.2. Assembly | 20 | ||
| 7.3. Storage | ............................................................................................................... | 20 | |
8. | Assembly instructions | 21 | ||
| 8.1. Assembly | 22 | ||
| 8.2. Mounting on the processing machine | 24 | ||
| 8.3. Mounting onto a machine hopper | 24 | ||
| 8.4. Mounting onto mixing hoppers with lateral inlet | 25 | ||
| 8.5. Mounting onto dosing station DT 30 | 25 | ||
| 8.6. Material feed | 26 | ||
| 8.7. Mounting the suction pipe MV | 26 | ||
| 8.8. Pipework | 27 | ||
| 8.9. Electrical connection | 27 |
4