Sterling SSE-5 BL operating instructions Table of contents

Page 5

 

 

 

 

SSE 5 BL

Table of contents

 

 

1.

1. General instructions

1-1

 

1.1. Warnings and symbols

1-2

 

1.2. Explanations and information

1-3

 

1.3. Legal basis

1-3

 

1.4. Fields of applications

1-3

 

1.5. Notes on usage

1-3

2.

Safety instructions

2-1

 

2.1. For your safety

2-2

 

2.1.1.

General

2-2

 

2.1.2.

Assembly

2-3

 

2.1.3.

Operation

2-4

 

2.1.4.

Maintenance

2-4

 

2.2. For the operating safety of the equipment

2-5

3.

Putting into operation

3-1

 

3.1. Checking the pipe system

3-2

 

3.2. Adjusting the suction pipes

3-3

 

3.3. Setting the controller

3-4

 

3.4. Initial conveying operations

3-5

 

3.5. Switching off the unit

3-5

4. Error and error correction

6

5.

Maintenance

8

 

5.1. Maintenance intervals

10

 

5.2. Servicing the conveyor

10

 

5.2.1.

Changing the sealing ring of the outlet flap

............................................ 11

 

5.2.2.

Adjusting the flap switch

12

 

5.2.3.

Cleaning the unit

13

 

5.3. Replacing carbon brushes at turbine

Error! Bookmark not defined.

6.

Functional description

15

 

6.1. General

...............................................................................................................

16

 

6.2. Controller

17

7. Transport, Assembly and Storage

19

 

7.1. Transport and Packing

20

 

7.2. Assembly

20

 

7.3. Storage

...............................................................................................................

20

8.

Assembly instructions

21

 

8.1. Assembly

22

 

8.2. Mounting on the processing machine

24

 

8.3. Mounting onto a machine hopper

24

 

8.4. Mounting onto mixing hoppers with lateral inlet

25

 

8.5. Mounting onto dosing station DT 30

25

 

8.6. Material feed

26

 

8.7. Mounting the suction pipe MV

26

 

8.8. Pipework

27

 

8.9. Electrical connection

27

4

Image 5
Contents Operating Instructions Single Conveyor Unit SSE-5 BL SSE 5 BL SSE 5 BL Parts and Service Department Table of contents Technical data Spare parts list SSE-2 General instructions SSE 5 BL Fields of applications Explanations and informationLegal basis Safety instructions General For your safetyAssembly Operation MaintenanceFor the operating safety of the equipment Putting into operation Checking the pipe system If the conditions points 3 + 4 are met Adjusting the suction pipesSetting the controller Initial conveying operations Switching off the unitError and error correction When the malfunction has been corrected press the key Maintenance SSE 5 BL Servicing the conveyor Maintenance intervalsChanging the sealing ring of the outlet flap Observe the direction of installation GOutlet flap Adjusting the flap switchOrder number Cleaning the unitFilter cloth Wire cloth Functional description General Controller ControllerSSE 5 BL Transport, Assembly and Storage Storage AssemblyTransport and Packing Assembly instructions CSE 5 BL Assembly Mounting onto a machine hopper Mounting on the processing machineMounting onto dosing station DT Mounting onto mixing hoppers with lateral inletMounting the suction pipe MV Material feedElectrical connection PipeworkInstallation of the signal line of the SKW optional Installation of the flap switch signal lineInstallation of the alarm indicating device optional Compressed-air supply Installing the accessoriesTechnical data SSE 5/BL Dimension Sheet Spare parts list SSE-f/BL, 230 V, 50 Hz Pos Order no Designation Wear Code SSE-5/BL, 230 V, 50 HzAccessories Accessories Electrical manual SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL