SSE 5 BL

Setting the line clear time

Press the “change-over” key and

then the “arrow key”.

&The line clear time which was last selected appears in the display. 0-99 seconds may be set for the line clear time.

FIf no line clear valve has been installed enter “0".

3.4. Initial conveying operations

Metal shavings may be inside the pipe from cutting down pipes into lengths. These are pulled during the first conveying process and collected in the separator.

FThis material should not be used again.

3.5. Switching off the unit

Disconnect the unit from mains supply by the device plug.

Putting into operation 3-5

Image 19
Contents Operating Instructions Single Conveyor Unit SSE-5 BL SSE 5 BL SSE 5 BL Parts and Service Department Table of contents Technical data Spare parts list SSE-2 General instructions SSE 5 BL Legal basis Explanations and informationFields of applications Safety instructions General For your safetyAssembly Operation MaintenanceFor the operating safety of the equipment Putting into operation Checking the pipe system If the conditions points 3 + 4 are met Adjusting the suction pipesSetting the controller Initial conveying operations Switching off the unitError and error correction When the malfunction has been corrected press the key Maintenance SSE 5 BL Servicing the conveyor Maintenance intervalsChanging the sealing ring of the outlet flap Observe the direction of installation GOutlet flap Adjusting the flap switchOrder number Cleaning the unitFilter cloth Wire cloth Functional description General Controller ControllerSSE 5 BL Transport, Assembly and Storage Transport and Packing AssemblyStorage Assembly instructions CSE 5 BL Assembly Mounting onto a machine hopper Mounting on the processing machineMounting onto dosing station DT Mounting onto mixing hoppers with lateral inletMounting the suction pipe MV Material feedElectrical connection PipeworkInstallation of the signal line of the SKW optional Installation of the flap switch signal lineInstallation of the alarm indicating device optional Compressed-air supply Installing the accessoriesTechnical data SSE 5/BL Dimension Sheet Spare parts list SSE-f/BL, 230 V, 50 Hz Pos Order no Designation Wear Code SSE-5/BL, 230 V, 50 HzAccessories Accessories Electrical manual SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL