Sterling SSE-5 BL operating instructions Compressed-air supply, Installing the accessories

Page 44

SSE 5 BL

8.10. Compressed-air supply

For operating the cleaning device, a compressed-air supply is necessary. Check compressed-air piping for correct installation and assembly.

Check fittings, length and quality of the hose connections for agreement with requirements. The operating pressure is 5-6 bar (72-87 PSI) (system overpressure).

Check the compressed-air supplied by the plant’s supply network.

Adjust compressed-air pressure to 5-6 bar (72-87 PSI) (system overpressure). Connect the unit to the plant’s supply network by means of a hose.

L F

Depressurize compressed-air supply lines which must be opened.

Compressed air must be dewatered, dustfree and oilfree. Install a maintenance unit if required.

Adjust pressure to a max. value of 6 bar (87 PSI) (system overpressure).

8.11. Installing the accessories

FSee chapter “Accessories”.

Assembly instructions 30

Image 44
Contents Operating Instructions Single Conveyor Unit SSE-5 BL SSE 5 BL SSE 5 BL Parts and Service Department Table of contents Technical data Spare parts list SSE-2 General instructions SSE 5 BL Fields of applications Explanations and informationLegal basis Safety instructions For your safety GeneralAssembly Maintenance OperationFor the operating safety of the equipment Putting into operation Checking the pipe system Adjusting the suction pipes If the conditions points 3 + 4 are metSetting the controller Switching off the unit Initial conveying operationsError and error correction When the malfunction has been corrected press the key Maintenance SSE 5 BL Maintenance intervals Servicing the conveyorObserve the direction of installation G Changing the sealing ring of the outlet flapAdjusting the flap switch Outlet flapCleaning the unit Order numberFilter cloth Wire cloth Functional description General Controller ControllerSSE 5 BL Transport, Assembly and Storage Storage AssemblyTransport and Packing Assembly instructions CSE 5 BL Assembly Mounting on the processing machine Mounting onto a machine hopperMounting onto mixing hoppers with lateral inlet Mounting onto dosing station DTMaterial feed Mounting the suction pipe MVPipework Electrical connectionInstallation of the flap switch signal line Installation of the signal line of the SKW optionalInstallation of the alarm indicating device optional Installing the accessories Compressed-air supplyTechnical data SSE 5/BL Dimension Sheet Spare parts list SSE-f/BL, 230 V, 50 Hz SSE-5/BL, 230 V, 50 Hz Pos Order no Designation Wear CodeAccessories Accessories Electrical manual SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL