8.8. Pipework
If PVC hoses are used for conveying, they must be grounded: draw out the copper lead on both ends of the hose and jam it between hose and tube. For fastening, use threaded clamps.
8.9. Electrical connection
The regulations of the local Electricity Board must be observed.
Before connection to the electricity supply, it should be ensured that the supply voltage and the power frequency are in accordance with the data on the name plate of the machine.
The electrical connection may only be carried out by Sterling service staff or trained personnel authorised by Sterling.
It is not permitted for other persons to undertake the electrical connection.
The main switch must be freely accessible.
Ground the equipment against electrostatic charging.
The operating voltage is 230 V/50 Hz.
Special voltages on request.
The connected load is approx. 1200 W.
The equipment is connected to mains supply by a device plug.
Separate fuse protection of the wall socket is required (max. 16 A).
Assembly instructions 27