Sterling SSE-5 BL Explanations and information, Legal basis, Fields of applications

Page 9

SSE 5 BL

1.2. Explanations and information

Various terms and designations are used in these operating instructions to ensure clarity. Therefore please note that the terms used in the text stand for the corresponding explanations listed below.

Equipment: ”Equipment” can mean an individual unit, a machine or an installation.

Operating personnel: The ”operating personnel” are persons operating the equipment on their own responsibility or according to instructions.

Operator: The ”operator” of the equipment (production manager, foreman, etc.) is the person responsible for all production sequences. The operator instructs the operating personnel of what is to be done.

Operating instructions: The ”operating instructions” describe the interaction of the equipment, production sequences or methods. The operating instructions must be compiled by the operator of the equipment.

Equipment foreman: When several operating personnel work on one machine, the ”equipment foreman” coordinates the sequences. The equipment foreman must be appointed by the operator.

Trained personnel: ”Trained personnel” are persons who, due to their training, are authorized to carry out the required work.

1.3. Legal basis

See “Manufacturer’s Certificate” resp. “Certificate of Conformity”.

1.4. Fields of applications

Sterling single conveying units are designed for use in facilities in which require independent machine conveying systems. The single conveying units have been developed for conveying thermoplastic granules. A typical area of application is for processing machines and drying hoppers with throughputs of up to 500 kg/h (1090 lbs/hr).

1.5. Notes on usage

Experienced operators can begin directly with the chapter on “Start-up” if the unit has been properly installed.

If the unit has not been installed yet, observe the instructions in the chapters “Transport, Assembly and Storage” and “Assembly Instructions”.

General instructions 1-3

Image 9
Contents Operating Instructions Single Conveyor Unit SSE-5 BL SSE 5 BL SSE 5 BL Parts and Service Department Table of contents Technical data Spare parts list SSE-2 General instructions SSE 5 BL Explanations and information Legal basisFields of applications Safety instructions General For your safetyAssembly Operation MaintenanceFor the operating safety of the equipment Putting into operation Checking the pipe system If the conditions points 3 + 4 are met Adjusting the suction pipesSetting the controller Initial conveying operations Switching off the unitError and error correction When the malfunction has been corrected press the key Maintenance SSE 5 BL Servicing the conveyor Maintenance intervalsChanging the sealing ring of the outlet flap Observe the direction of installation GOutlet flap Adjusting the flap switchOrder number Cleaning the unitFilter cloth Wire cloth Functional description General Controller ControllerSSE 5 BL Transport, Assembly and Storage Assembly Transport and PackingStorage Assembly instructions CSE 5 BL Assembly Mounting onto a machine hopper Mounting on the processing machineMounting onto dosing station DT Mounting onto mixing hoppers with lateral inletMounting the suction pipe MV Material feedElectrical connection PipeworkInstallation of the signal line of the SKW optional Installation of the flap switch signal lineInstallation of the alarm indicating device optional Compressed-air supply Installing the accessoriesTechnical data SSE 5/BL Dimension Sheet Spare parts list SSE-f/BL, 230 V, 50 Hz Pos Order no Designation Wear Code SSE-5/BL, 230 V, 50 HzAccessories Accessories Electrical manual SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL