Sterling SSE-5 BL operating instructions SSE 5 BL

Page 56

SSE 5 BL

Electrical manual 42

Image 56
Contents Operating Instructions Single Conveyor Unit SSE-5 BL SSE 5 BL SSE 5 BL Parts and Service Department Table of contents Technical data Spare parts list SSE-2 General instructions SSE 5 BL Fields of applications Explanations and informationLegal basis Safety instructions For your safety GeneralAssembly Maintenance OperationFor the operating safety of the equipment Putting into operation Checking the pipe system Adjusting the suction pipes If the conditions points 3 + 4 are metSetting the controller Switching off the unit Initial conveying operationsError and error correction When the malfunction has been corrected press the key Maintenance SSE 5 BL Maintenance intervals Servicing the conveyorObserve the direction of installation G Changing the sealing ring of the outlet flapAdjusting the flap switch Outlet flapCleaning the unit Order numberFilter cloth Wire cloth Functional description General Controller ControllerSSE 5 BL Transport, Assembly and Storage Storage AssemblyTransport and Packing Assembly instructions CSE 5 BL Assembly Mounting on the processing machine Mounting onto a machine hopperMounting onto mixing hoppers with lateral inlet Mounting onto dosing station DTMaterial feed Mounting the suction pipe MVPipework Electrical connectionInstallation of the flap switch signal line Installation of the signal line of the SKW optionalInstallation of the alarm indicating device optional Installing the accessories Compressed-air supplyTechnical data SSE 5/BL Dimension Sheet Spare parts list SSE-f/BL, 230 V, 50 Hz SSE-5/BL, 230 V, 50 Hz Pos Order no Designation Wear CodeAccessories Accessories Electrical manual SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL