Sterling SSE-5 BL operating instructions Assembly instructions

Page 35

SSE 5 BL

8. Assembly instructions

￿These installation instructions are intended for persons with skills in electrical and mechanical areas due to their training, experience and received instructions.

Personnel using these installation instructions must be instructed in the regulations for the prevention of accidents, the operating conditions and safety regulations and their implementation.

Ensure in each case that the personnel are informed.

The installation instructions provided in the corresponding operating instructions apply for all connected equipment.

Please observe all safety regulations for the operation of lifting gear.

All installation work must be carried out with the equipment disconnected from electrical power an compressed air supply.

LFor installation work taking place at heights of over approx. 6 feet, use only ladders or similar equipment and working platforms intended for this purpose. At greater heights, the proper equipment for protection against falling must be worn.

Use only suitable lifting gear which is in proper working order and load suspension devices with sufficient carrying capacity. Do not stand or work under suspended loads!

Use only suitable workshop equipment.

FInstall the equipment such that all parts are easily accessible; this facilitates maintenance and repair work.

Assembly instructions 21

Image 35
Contents Operating Instructions Single Conveyor Unit SSE-5 BL SSE 5 BL SSE 5 BL Parts and Service Department Table of contents Technical data Spare parts list SSE-2 General instructions SSE 5 BL Fields of applications Explanations and informationLegal basis Safety instructions General For your safetyAssembly Operation MaintenanceFor the operating safety of the equipment Putting into operation Checking the pipe system If the conditions points 3 + 4 are met Adjusting the suction pipesSetting the controller Initial conveying operations Switching off the unitError and error correction When the malfunction has been corrected press the key Maintenance SSE 5 BL Servicing the conveyor Maintenance intervalsChanging the sealing ring of the outlet flap Observe the direction of installation GOutlet flap Adjusting the flap switchOrder number Cleaning the unitFilter cloth Wire cloth Functional description General Controller ControllerSSE 5 BL Transport, Assembly and Storage Storage AssemblyTransport and Packing Assembly instructions CSE 5 BL Assembly Mounting onto a machine hopper Mounting on the processing machineMounting onto dosing station DT Mounting onto mixing hoppers with lateral inletMounting the suction pipe MV Material feedElectrical connection PipeworkInstallation of the signal line of the SKW optional Installation of the flap switch signal lineInstallation of the alarm indicating device optional Compressed-air supply Installing the accessoriesTechnical data SSE 5/BL Dimension Sheet Spare parts list SSE-f/BL, 230 V, 50 Hz Pos Order no Designation Wear Code SSE-5/BL, 230 V, 50 HzAccessories Accessories Electrical manual SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL SSE 5 BL